8.2
Operating voltage supply U
EL/SEN
NOTICE!
Malfunction due to faulty installation.
•
Please note the information regarding the line specification, power supply
and earthing measures.
1. Please note the information in the “Instruction manual for Automation system
CPX-E”
è
1.1 Further applicable documents.
2. Make sure that the power supply is switched off.
3. Connect the lines to the terminal strip in accordance with the “Instruction
manual for Automation system CPX-E”
è
1.1 Further applicable documents.
9
Commissioning
You can find information on commissioning the automation system CPX-E in the
“Instruction manual for automation system CPX-E”.
You can find information on the parameters in the “Description of
automation system CPX-E” and in the descriptions of the modules used
è
1.1 Further applicable documents.
9.1
Behaviour of the display components after error-free commissioning
[MS] (green)
[NS] (green)
[XF1], [XF2] (green)
Lit
Lit
Lit or flashing
Tab. 10 Display components after error-free commissioning
[PS] (green)
[PL] (green)
[SF] (red)
[M] (yellow)
Lit
Lit
Off
Off
Tab. 11 Display components after error-free commissioning
You can find information on troubleshooting in the event of incorrect behaviour in
the “Description of Automation system CPX-E” and the descriptions of the mod-
ules used
è
1.1 Further applicable documents.
9.2
Commissioning with CODESYS
CAUTION!
Risk of injury due to uncontrolled movements of the connected actuators.
•
Perform test runs of projects and applications without active actuators first.
•
For the configuration, parameterisation and programming of the product, use
CODESYS V3.
Requirements
–
PC (from Windows 7) with Ethernet interface
–
Components for network connection
–
Programming software CODESYS V3
–
Package CPX-E-CEC compliant with firmware of product
Preparations
The user requires administrator rights to install and operate programming soft-
wareCODESYS V3.
1. Install CODESYS V3.
2. CODESYS V3 with administrator rights.
3. Open Package Manager
è
menu command [Tools] [Package Manager].
4. Install current package for CPX-E-CEC
è
Online help for CODESYS V3
è
Package Manager.
5. Restart CODESYS V3.
6. Connect the controller to the network connection [ETH1] or [ETH2] through a
switch/hub or directly to the PC
è
7. Adapt the network settings
è
menu command [Online] [Scan Festo devices]
è
Online help for CODESYS V3
è
Scan Festo Devices.
The current version of the package CPX-E-CEC for CODESYS V3 is available in the
Festo Support Portal
è
Further information is available in the product-specific Help
è
Online help for CODESYS V3
è
Getting started.
Procedure for unwanted program states
If a program with real-time priority is not responding:
1. Set run/stop switch to stop.
Ä
The boot application cannot be started.
2. Restart the controller.
3. Establish connection to CPX-E-CEC.
4. Delete boot application using “Reset device to original state”
è
General help for CODESYS V3.
10
Service
NOTICE!
Accumulation of heat due to reduced air supply to electronics.
•
Keep the ventilation slots free and regularly remove contamination.
10.1
Firmware service (update)
•
Update the controller firmware with suitable software from Festo
è
11
Diagnostics and fault clearance
11.1
Diagnostics options
Various options are available for diagnosing errors:
–
Internal system diagnostics
–
LED indicators on the product
11.2
Internal system diagnostics
The internal system diagnostics is described in the “Description of automation
system CPX-E”
è
1.1 Further applicable documents.
11.3
LED indicators
The module- and network-specific LED displays are described below.
The system-specific LED indicators are described in the documents for the auto-
mation system CPX-E
è
1.1 Further applicable documents.
Module-specific LED indicators
Operation [Run]
LED
(green)
Meaning
Remedy
Lit
CODESYS application is running
–
Off
CODESYS application is not available or
has stopped
–
Tab. 12 Operation [Run]
Ethernet interfaces [LAETH1] [LAETH2]
LED
(green)
Meaning
Remedy
Lit
Network connection established
Status “Link”
–
Flashing
Network connection established
Status “Activity”
–
Off
No network connection
Check network connection.
Tab. 13 Ethernet interfaces [LAETH1] [LAETH2]
EtherCAT interface [LA EC]
LED
(green)
Meaning
Remedy
Lit
Network connection established
Status “Link”
–
Flashing
Network connection established
Status “Activity”
–