![Festo CPV GEASI-4 Series Brief Description Download Page 10](http://html1.mh-extra.com/html/festo/cpv-geasi-4-series/cpv-geasi-4-series_brief-description_2284143010.webp)
Festo CPV..-GE-ASI-... 2017-11e English
10
4.3 Connecting the AS-Interface bus and the load voltage
Please note
The setting of a DIP switch determines the connection
via which the load voltage supply for the outputs (valve
solenoid coils) is provided, see section 4.2.
‒ via the load voltage connection,
‒ via the AS-Interface bus.
Note the following when converting the valve terminal:
S
Switch on the power supply only if the DIP switch is
positioned at a permitted setting.
Warning
Use power supplies which guarantee reliable electrical
isolation of the operating voltage as per IEC/DIN EN
60204-1. Consider also the general requirements for
PELV circuits in accordance with IEC/DIN EN 60204-1.
By the use of PELV circuits, protection against electric
shock (protection against direct and indirect contact) is
guaranteed in accordance with IEC/EN 60204-1 (Electri
cal equipment for machines, General requirements).