![Ferroli ENERGY TOP W 125 Instructions For Use, Installation And Maintenance Download Page 52](http://html1.mh-extra.com/html/ferroli/energy-top-w-125/energy-top-w-125_instructions-for-use-installation-and-maintenance_2281994052.webp)
ENERGY TOP W 70 - W 80 - W 125
52
EN
Before proceeding with installation, check with table 2 that the maximum permissible
length is not exceeded, bearing in mind that every coaxial bend gives rise to the reduc-
tion indicated in the table. For example, a Ø 80/125 duct comprising a 90° bend + 1 hor-
izontal metre has a total equivalent length of 1.5 metres.
Table. 2 - Max. length coaxial ducts
Connection with separate pipes
fig. 27 - Examples of connection with separate pipes (
= Air /
= Fumes)
Separate Ø80 ducts can be connected directly to the unit.
Before proceeding with installation, make sure the maximum permissible length has not
been exceeded, by means of a simple calculation:
1.
Establish the layout of the system of split flues, including accessories and outlet ter-
minals.
2.
Consult the table 4 and identify the losses in m
eq
(equivalent metres) of every com-
ponent, according to the installation position.
3.
Check that the sum total of losses is less than or equal to the maximum permissible
length in table 3.
Table. 3 - Max. length separate ducts
Table. 4 - Accessories
3.7 Condensate drain connection
The boiler is equipped with a trap to drain condensate. Carry out the following instruc-
tions for fitting.
1.
Fix the support bracket "A" to the bottom of the boiler.
2.
Connect the preformed black tube "B" to the condensate drain "S" on the bottom of
the boiler, fixing it with a clamp.
3.
Remove the trap ring nut "C" and insert the preformed black tube "B" in the special
opening, making sure to fit the seal "D".
4.
Refit the trap ring nut, insert it in the bracket and fix with the special clip "E".
5.
Connect the flexible tube "F" from the trap to the condensate drain system.
fig. 28 - Condensate drain connection
4. SERVICE AND MAINTENANCE
All adjustment, conversion, startup and maintenance operations described below must
only be carried out by Qualified Personnel (meeting the professional technical require-
ments prescribed by current regulations) such as those of the Local After-Sales Techni-
cal Service.
FERROLI
declines any liability for damage and/or injury caused by unqualified and un-
authorised persons tampering with the unit.
4.1 Adjustments
Gas conversion
The unit can operate on Natural Gas or LPG and is factory-set for use with one of these
two gases, as clearly shown on the packing and on the dataplate. Whenever a different
gas to that for which the unit is set has to be used, the special conversion kit will be re-
quired, proceeding as follows:
1.
Disconnect the power supply to the boiler.
2.
Remove the casing.
3.
Detach the electrical connections from the gas valve controller.
4.
Unscrew the gas valve (
e
) fixing ring fig. 29“A” fig. 30.
5.
Undo the two fixing screws
“B”
and remove the fan assembly as indicated in fig. 29
for the model
ENERGY TOP W 70 - W 80
and in fig. 30 for the model
ENERGY TOP
W 125
.
fig. 29 - model ENERGY TOP W 70 - W 80
ENERGY TOP W 70 - W 80
ENERGY TOP W 125
Coaxial 80/125
Coaxial 80/125
Max. permissible length
4 m
2 m
Reduction factor 90° bend
0.5 m
0.5 m
Reduction factor 45° bend
0.25 m
0.25 m
Separate ducts
ENERGY TOP W 70 - W 80
ENERGY TOP W 125
Max. permissible length
20 m
eq
10 m
eq
Losses in m
eq
Air
inlet
Fume exhaust
Vertical
Horizontal
Ø 80
PIPE
1 m M/F
1KWMA83W
1.0
1.6
2.0
BEND
45° M/F
1KWMA65W
1.2
1.8
90° M/F
1KWMA01W
1.5
2.0
PIPE SECTION
with test point
1KWMA70W
0.3
0.3
TERMINAL
air, wall
1KWMA85A
2.0
-
fumes, wall with antiwind
1KWMA86A
-
5.0
C
53
C
33
C
53
B
23
C
13
B
B
A
cod. 3541G330 - Rev. 00 - 07/2015
Summary of Contents for ENERGY TOP W 125
Page 118: ......
Page 119: ......
Page 120: ...FERROLI S p A Via Ritonda 78 a 37047 San Bonifacio Verona ITALY www ferroli it...