![Feniex L-22109 Installation And Operational Manual Download Page 6](http://html.mh-extra.com/html/feniex/l-22109/l-22109_installation-and-operational-manual_552718006.webp)
Programming Takedowns, Alleys or Directional
Enter program mode by connecting the Blue/Black, the Blue/White and the Green/White together tap 10 times to 12 V+.
Programming Front Takedowns:
Connect Blue/White to 12 V
And connect the
required wires
to 12Vs, tap Black/White to lock the selection.
Rear Takedowns:
Connect Green/White to 12 V
And connect the
required wires
to 12Vs, tap Black/White to lock the selection.
Alleys:
Connect Blue/White to 12 V
And connect the Red/Black to 12Vs, tap White/Black to lock the selection.
Arrow Sticks:
Connect Green/White to 12 V
And connect the
required wires
to 12Vs, tap Red/White to lock the selection.
Required Wires:
Position 1 – Black
Position 2 – Red
Position 3 – Orange
Position 4 – Green
Position 5 – Blue
Position 6 – White
Illustration shown indicates corresponding positions with required wires. The image shown is for a 57” bar. The
Avatar 27” will implement only positions 1, 2 and 6. The 37” will implement positions 1, 2, 3 and 6, while the 47”
will use have positions 1,2,3,4, and 6.
WIRING DIAGRAM
www.Feniex.com
©Feniex Industries, Inc.