CAP-835
18
downtime, can cause significant
material damage to the screw
compressor.
-
Add 0.5 quarts of oil directly in
the compressor airend before
initial commissioning or after a
longer downtime.
Fig. 8: Intake valve fastening screw
1.
Unfasten the fastening screws on the intake
valve (Fig. 8-1).
NOTICE!
Property damage due to incorrect
oil!
Mixing different oils or using
incorrect oils causes significant
property damage to the screw
compressor.
-
Only use the oil prescribed in the
technical data.
-
For high temperature systems,
use only fully synthetic oil FSC-
8000.
2.
Unscrew the intake valve.
3.
Pour oil directly into the compressor airend.
4.
Re-fit the intake valve and tighten the
screws.
3.6 Switching on after installation
1.
Check all connections to make sure they are
installed correctly and all screws are properly
fastened.
2.
Make sure that there are no tools or loose
objects lying in or on the machine.
3.
Install the enclosure doors and make sure
that they are sealed.
4.
Carefully open the shut-off valve downstream
of the discharge port between the screw
compressor and the compressed air network.
The screw compressor is now connected
to the compressed air network.
5.
Switch on the main switch.
6.
Start the screw compressor
controller
documentation
.
The compressor is ready and may start up
automatically at any time.
3.7 Work after the initial
commissioning
WARNING!
Danger of injury from hot
surfaces!
Surfaces of components can heat
up a lot during operation. Skin
contact with hot surfaces will cause
severe skin burns.
-
Wear heat-resistant protective
clothing and protective gloves
during all work near hot
surfaces.
-
Before all work, make sure that
all surfaces have cooled off to
the ambient temperature, wait at
least 30 minutes.
CAUTION!
Danger of injury from oil vapor!
In case of high temperatures oil
vapor can form. Oil vapor can
irritate eyes and the respiratory
system.
-
When working on the oil system
and if an oil vapor arises, wear
breathing protection and
protective goggles and ensure
that there is a fresh air supply.
1.
Switch the screw compressor off and secure
it to prevent it from being switched back on
again.
2.
Open and remove the cubicle doors with the
special wrench.
3.
Wait until the components have cooled.