6. STARTING UP THE DISPENSER
6.1 Leak Check and Prime
NF*
1
Remove the side panels by loosening the two screws located at the bottom of the
panel and then lifting off the frame.
2
Remove the drip tray by lifting up and pulling away and then remove access panel to expose the
solution modules.
3
Connect the BIB connectors to the syrup BIBs.
4
Turn on the water and the CO2 supplies. Ensure both are flowing to the dispenser.
Note:
The water and syrup pumps will activate loudly until the lines are pressurized.
5
Thoroughly check for leaks at all connections.
6
Install a 1/4” I.D. tube on the sample port shown in
Figure 6.1
. Open the sample valve and collect
the water/syrup in a cup. Continue to prime until syrup flow has been established and all air has
been removed from the lines. Discard the samples. Repeat for all barrels.
Sample Valve
(shown open)
Sample Port
(tube not shown)
Figure 6.1 Sample Valve on Solution Module
*Refer to Appendices for additional information on Nitrofub configuration.