![Fayat Bomag BPR 25/40 Operating Instructions Manual Download Page 48](http://html1.mh-extra.com/html/fayat/bomag-bpr-25-40/bomag-bpr-25-40_operating-instructions-manual_546877048.webp)
5.6 Checking the water level, topping up
NOTICE!
Components may get damaged by frost!
–
Drain all water off if there is a risk of frost.
Protective equipment:
n
Working clothes
n
Safety shoes
n
Protective gloves
1.
Clean the area around the filling port.
2.
Remove the cap and check the water supply in the water
tank.
NOTICE!
Dirty or contaminated water can block the bore-
holes!
–
Fill only with clean water.
3.
If necessary, fill in clean water.
4.
Close the cap.
Alternatively, the water tank can also be removed
and transported for filling.
1.
Pull the spraying hoses off the valve.
Water
B-692-0230
Fig. 27
B-692-0233
Fig. 28
Checks prior to start up – Checking the water level, topping up
BPR 25/40
49
Go
to
Discount-Equipment.com
to
order
your
parts