3.9.5 Measures for longer shut-down periods
If the machine is taken out of operation for a longer period of time,
various conditions must be met and maintenance work must be
carried out both before and after shut-down
‘Measures prior to extended shut-down period’ on page 99
.
It is not necessary to define a maximum storage period if these
measures have been performed.
3.9.6 After maintenance work
Reassemble all guards and protections.
Concerning your safety – Maintenance work
DRP45DX
34
Summary of Contents for DYNAPAX DRP45DX
Page 6: ...Table of contents DRP45DX 6...
Page 7: ...1 Introduction Introduction DRP45DX 7...
Page 11: ...2 Technical data Technical data DRP45DX 11...
Page 15: ...3 Concerning your safety Concerning your safety DRP45DX 15...
Page 41: ...4 Indicators and control elements Indicators and control elements DRP45DX 41...
Page 47: ...5 Checks prior to start up Checks prior to start up DRP45DX 47...
Page 53: ...6 Operation Operation DRP45DX 53...
Page 61: ...7 Loading transporting the machine Loading transporting the machine DRP45DX 61...
Page 64: ...Loading transporting the machine Lashing the machine to the transport vehicle DRP45DX 64...
Page 65: ...8 Maintenance Maintenance DRP45DX 65...
Page 102: ...Maintenance As required DRP45DX 102...
Page 103: ...9 Troubleshooting Troubleshooting DRP45DX 103...
Page 114: ...Troubleshooting DCI faults DRP45DX 114...
Page 115: ...10 Disposal Disposal DRP45DX 115...
Page 117: ......
Page 118: ......