Miscellaneous
4812162101_D.pdf
2021-12-14
Towing the roller
Fig. Towing
The roller must be counter-braked during
towing/recovery. Always use a towbar. There is no
braking capacity on the roller now.
The roller must be counter-braked during
towing/recovery. Always use a towbar. There is no
braking capacity on the roller now.
The roller must be towed slowly, max. 3 kph (2
mph) and only towed short distances, max. 300 m
(1000 ft).
The roller must be towed slowly, max. 3 kph (2
mph) and only towed short distances, max. 300 m
(1000 ft).
When towing/retrieving a machine, the towing device
must be connected to both lifting holes. The pulling
force shall act longitudinally on the machine as shown
in the figure. Maximum total pulling force 130 kN
(29225 lbf).
Reverse the towing preparations.
Reverse the towing preparations.
Transport
Tie-down and secure the machine according to the
Cargo Securing Certificate for the specific machine if
this is avaliable and applicable.
If not, tie down and secure the machine according to
the cargo securing rules that are valid for the country
where the transport takes place.
Never lash over the machine’s articulated joint, nor
over the machine’s operator platform.
Never lash over the machine’s articulated joint, nor
over the machine’s operator platform.
Before securing the machine ensure that :
• the parking brake is applied and in good working condition
• the articulated joint is in closed position
• the machine is centered laterally on the platform
• the lashings are in good condition and fulfills the
corresponding rules for transport securing.
57
Summary of Contents for DYNAPAC CC1300C
Page 2: ......
Page 10: ...e 4812162101_D pdf 2021 12 14...
Page 14: ...Introduction 4812162101_D pdf 2021 12 14 4...
Page 22: ...Special instructions 4812162101_D pdf 2021 12 14 12...
Page 30: ...Technical specifications 4812162101_D pdf 2021 12 14 20...
Page 34: ...Machine description 4812162101_D pdf 2021 12 14 24...
Page 48: ...Machine description 4812162101_D pdf 2021 12 14 38...
Page 72: ...Operating instructions Summary 4812162101_D pdf 2021 12 14 62...
Page 83: ...Maintenance Maintenance schedule 4812162101_D pdf 2021 12 14 Service Checklist 73...
Page 84: ...Maintenance Maintenance schedule 4812162101_D pdf 2021 12 14 74...
Page 102: ...Maintenance measures 250 h 4812162101_D pdf 2021 12 14 92...
Page 120: ...Maintenance 1000h 4812162101_D pdf 2021 12 14 110...
Page 134: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com...