D 43 25
1.4
Starting for paving
Set the switches, levers and
controls listed below to the specified positions
when the
screed has reached its operating temperature and a sufficient amount of material lies
in front of the screed
- Push the drive lever (13) all the way to the front and start driving.
- Observe the distribution of the material and adjust the limit switches if necessary.
- Set the compacting elements (tamper / vibration) according to the required com-
paction ratio.
- Let the paving master check the paving thickness after 5–6 meters and correct
if necessary.
Carry out the check in the area of the caterpillar chains or drive wheels as the screed
tends to level an uneven ground. The reference points for the layer thickness are the
caterpillar chains or drive wheels.
The basic setting of the screed must be corrected when the actual layer thickness de-
viates significantly from the values indicated by the scales (see the operating instruc-
tions for the screed).
A
The basic setting is for asphalt material.
Item
Travelling direction
Position
13
Drive lever
Centre position
33
Traction drive fast/slow
LED OFF
15
Travel drive preselector
Mark 6-7
70
Preparation for screed floating posi-
tion
LED ON
72
Vibration
LED ON
71
Tamper
LED ON
53/54
Auger left/right
Auto
123
47/48
Conveyor left/right
Auto
127
126 /
130
Levelling
Auto
Speed regulator, vibration
adapted to the paving situation
Speed control for the tamper
adapted to the paving situation
Summary of Contents for 897
Page 2: ...www dynapac com ...
Page 14: ...12 ...
Page 28: ...A 2 ...
Page 37: ...B 9 4 Safety devices 4 5 6 7 10 7 9 3 2 5 11 7 13 1 12 8 14 ...
Page 51: ...B 23 71 70 40 41 42 xxxxxxxxxxxxxxxxx 10 9 10 73 12 12 13 9 ...
Page 96: ...D 13 4 10 13 16 15 17 11 12 9 8 7 ...
Page 98: ...D 13 6 10 13 16 15 17 11 12 9 8 7 ...
Page 100: ...D 13 8 10 13 16 15 17 11 12 9 8 7 ...
Page 102: ...D 13 10 18 19 20 21 ...
Page 104: ...D 13 12 22 23 24 25 ...
Page 106: ...D 13 14 26 27 28 ...
Page 108: ...D 13 16 29 ...
Page 110: ...D 13 18 33 32 ...
Page 112: ...D 13 20 35 34 36 37 ...
Page 114: ...D 13 22 38 40 41 39 42 ...
Page 116: ...D 13 24 38 40 41 39 42 ...
Page 118: ...D 13 26 38 40 41 39 42 ...
Page 120: ...D 13 28 44 43 45 46 ...
Page 122: ...D 13 30 48 52 50 47 51 49 ...
Page 124: ...D 13 32 48 52 50 47 51 49 ...
Page 126: ...D 13 34 48 52 50 47 51 49 ...
Page 128: ...D 13 36 54 58 56 53 57 55 ...
Page 130: ...D 13 38 54 58 56 53 57 55 ...
Page 132: ...D 13 40 54 58 56 53 57 55 ...
Page 134: ...D 13 42 60 59 ...
Page 136: ...D 13 44 64 61 62 66 65 63 ...
Page 138: ...D 13 46 64 61 62 66 65 63 ...
Page 140: ...D 13 48 68 67 ...
Page 142: ...D 13 50 70 69 ...
Page 144: ...D 13 52 72 71 ...
Page 146: ...D 13 54 74 73 ...
Page 148: ...D 13 56 76 75 ...
Page 150: ...D 13 58 78 77 ...
Page 152: ...D 13 60 3 Remote control ...
Page 154: ...D 13 62 121 120 121 ...
Page 156: ...D 13 64 122 124 125 123 125 122 124 ...
Page 158: ...D 13 66 122 124 125 123 125 122 124 ...
Page 160: ...D 13 68 122 124 125 123 125 122 124 ...
Page 162: ...D 13 70 122 124 125 123 125 122 124 ...
Page 164: ...D 13 72 131 132 133 130 ...
Page 166: ...D 13 74 135 136 137 134 ...
Page 168: ...D 13 76 140 138 140 139 ...
Page 170: ...D 13 78 ...
Page 171: ...D 22 1 D 22 Operating the display ...
Page 174: ...D 22 4 1 1 Menu operation procedure for adjusting parameters A B C ...
Page 201: ...D 22 31 Service menu Password protected menu for various service settings ...
Page 220: ...D 22 50 Example C ...
Page 267: ...D 31 5 Control platform moveable o 6 2 5 7 9 4 8 3 ...
Page 271: ...D 31 9 Protective cabin o A D B C B A C D 1 3 4 5 2 ...
Page 306: ...D 31 44 ...
Page 311: ...D 43 5 13 11 12 10 15 120 ...
Page 313: ...D 43 7 13 11 12 10 15 120 ...
Page 316: ...D 43 10 13 68 ...
Page 318: ...D 43 12 A B C ...
Page 320: ...D 43 14 D 68 50 56 55 49 ...
Page 322: ...D 43 16 35 34 15 13 16 69 63 61 64 46 45 126 130 68 75 ...
Page 324: ...D 43 18 A 33 15 13 16 10 ...
Page 328: ...D 43 22 A B 59 67 37 36 54 48 53 47 ...
Page 330: ...D 43 24 15 123 127 126 130 126 130 13 73 70 54 48 53 47 71 72 ...
Page 334: ...D 43 28 13 15 74 73 70 69 ...
Page 337: ...D 43 31 ...
Page 338: ...D 43 32 13 15 74 73 70 69 ...
Page 340: ...D 43 34 13 15 11 ...
Page 342: ...D 43 36 13 11 15 69 75 ...
Page 362: ...E 13 14 Symbol Meaning Outer auger bearing Auger end bearing ...
Page 379: ...E 13 31 Symbol Meaning RL Extension pipe left RR Extension pipe right RL RR ...
Page 412: ...E 13 64 ...
Page 418: ...F 29 4 ...
Page 419: ...F 33 1 F 33 Maintenance conveyor 1 Maintenance conveyor ...
Page 426: ...F 33 8 ...
Page 427: ...F 40 1 F 40 Maintenance auger assembly 1 Maintenance auger assembly ...
Page 439: ...F 41 1 F 41 Maintenance auger assembly 1 Maintenance auger assembly external drive version ...
Page 480: ...F 53 18 ...
Page 514: ...F 55 34 ...
Page 515: ...F 61 1 F 61 Maintenance hydraulic system 1 Maintenance hydraulic system ...
Page 531: ...F 72 1 F 72 Maintenance travel drive steering 1 Maintenance travel drive steering ...
Page 542: ...F 72 12 ...
Page 543: ...F 83 1 F 83 Maintenance electrical system 1 Maintenance electrical system ...
Page 552: ...F 83 10 Fuses in terminal box B 15 10 15 25 15 10 15 25 15 10 10 15 25 15 15 10 25 10 ...
Page 555: ...F 83 13 Relays in terminal box C 15 10 15 25 15 10 15 25 15 10 10 15 25 15 15 10 25 10 ...
Page 557: ...F 83 15 Relays in the engine compartment E K 0 Engine start ...
Page 558: ...F 83 16 ...
Page 566: ...F 90 8 ...
Page 567: ...F 100 1 F 100 Tests stopping 1 Tests checks cleaning stopping ...
Page 581: ...F 115 3 2 1 6 5 7 4 3 6 8 9 ...
Page 588: ...F 115 10 ...
Page 590: ...www dynapac com ...