
A 1
A Correct use and application
A
The "Guidelines for the Correct Use and Application of Paver Finishers" compiled by
Dynapac are included in the scope of delivery for the present machine. The
guidelines are part of the present operating instructions and must always be heeded.
National regulations are fully applicable.
The road construction machine described in these operating instructions is a paver
finisher that is suited for laying mixed materials, roll-down concrete or lean-mixed
concrete, track-laying ballast and unbound mineral aggregates for foundations for
paving.
The paver finisher must be used, operated and maintained according to the
instructions given in the present operating instructions. Any other use is regarded as
improper use and can cause injury to persons or damage to the paver finisher or other
equipment or property.
Any use going beyond the range of applications described above is regarded as
improper use and is expressly forbidden! Especially in those cases where the paver
finisher is to be operated on inclines or where it is to be used for special purposes
(construction of dumps, dams), it is absolutely necessary to contact the manufacturer.
Duties of the user:
A "user" within the meaning of these operating instructions is
defined as any natural or legal person who either uses the paver finisher himself, or
on whose behalf it is used. In special cases (e.g. leasing or renting), the user is
considered to be the person who, in accordance with existing contractual agreements
between the owner and the user of the paver finisher, is charged with the observance
of the operating duties.
The user must ensure that the paver finisher is only used in the stipulated manner and
that all danger to life and limb of the operator, or third parties, is avoided. In addition
to this, it must be ensured that the relevant accident prevention regulations and other
safety-related provisions as well as the operating, servicing and maintenance
guidelines are observed. The user must also ensure that all persons operating the
paver finisher have read and understood the present operating instructions.
Mounting of attachments:
The paver finisher must only be operated in conjunction
with screeds that have been approved by the manufacturer. Mounting or installation
of any attachments that will interfere with or supplement the functions of the paver
finisher is permitted only after written approval by the manufacturer has been
obtained. If necessary, the approval of local authorities must be obtained.
Any approval obtained from local authorities does not, however, make approval by
the manufacturer unnecessary.
Summary of Contents for 897
Page 2: ...www dynapac com ...
Page 14: ...12 ...
Page 28: ...A 2 ...
Page 37: ...B 9 4 Safety devices 4 5 6 7 10 7 9 3 2 5 11 7 13 1 12 8 14 ...
Page 51: ...B 23 71 70 40 41 42 xxxxxxxxxxxxxxxxx 10 9 10 73 12 12 13 9 ...
Page 96: ...D 13 4 10 13 16 15 17 11 12 9 8 7 ...
Page 98: ...D 13 6 10 13 16 15 17 11 12 9 8 7 ...
Page 100: ...D 13 8 10 13 16 15 17 11 12 9 8 7 ...
Page 102: ...D 13 10 18 19 20 21 ...
Page 104: ...D 13 12 22 23 24 25 ...
Page 106: ...D 13 14 26 27 28 ...
Page 108: ...D 13 16 29 ...
Page 110: ...D 13 18 33 32 ...
Page 112: ...D 13 20 35 34 36 37 ...
Page 114: ...D 13 22 38 40 41 39 42 ...
Page 116: ...D 13 24 38 40 41 39 42 ...
Page 118: ...D 13 26 38 40 41 39 42 ...
Page 120: ...D 13 28 44 43 45 46 ...
Page 122: ...D 13 30 48 52 50 47 51 49 ...
Page 124: ...D 13 32 48 52 50 47 51 49 ...
Page 126: ...D 13 34 48 52 50 47 51 49 ...
Page 128: ...D 13 36 54 58 56 53 57 55 ...
Page 130: ...D 13 38 54 58 56 53 57 55 ...
Page 132: ...D 13 40 54 58 56 53 57 55 ...
Page 134: ...D 13 42 60 59 ...
Page 136: ...D 13 44 64 61 62 66 65 63 ...
Page 138: ...D 13 46 64 61 62 66 65 63 ...
Page 140: ...D 13 48 68 67 ...
Page 142: ...D 13 50 70 69 ...
Page 144: ...D 13 52 72 71 ...
Page 146: ...D 13 54 74 73 ...
Page 148: ...D 13 56 76 75 ...
Page 150: ...D 13 58 78 77 ...
Page 152: ...D 13 60 3 Remote control ...
Page 154: ...D 13 62 121 120 121 ...
Page 156: ...D 13 64 122 124 125 123 125 122 124 ...
Page 158: ...D 13 66 122 124 125 123 125 122 124 ...
Page 160: ...D 13 68 122 124 125 123 125 122 124 ...
Page 162: ...D 13 70 122 124 125 123 125 122 124 ...
Page 164: ...D 13 72 131 132 133 130 ...
Page 166: ...D 13 74 135 136 137 134 ...
Page 168: ...D 13 76 140 138 140 139 ...
Page 170: ...D 13 78 ...
Page 171: ...D 22 1 D 22 Operating the display ...
Page 174: ...D 22 4 1 1 Menu operation procedure for adjusting parameters A B C ...
Page 201: ...D 22 31 Service menu Password protected menu for various service settings ...
Page 220: ...D 22 50 Example C ...
Page 267: ...D 31 5 Control platform moveable o 6 2 5 7 9 4 8 3 ...
Page 271: ...D 31 9 Protective cabin o A D B C B A C D 1 3 4 5 2 ...
Page 306: ...D 31 44 ...
Page 311: ...D 43 5 13 11 12 10 15 120 ...
Page 313: ...D 43 7 13 11 12 10 15 120 ...
Page 316: ...D 43 10 13 68 ...
Page 318: ...D 43 12 A B C ...
Page 320: ...D 43 14 D 68 50 56 55 49 ...
Page 322: ...D 43 16 35 34 15 13 16 69 63 61 64 46 45 126 130 68 75 ...
Page 324: ...D 43 18 A 33 15 13 16 10 ...
Page 328: ...D 43 22 A B 59 67 37 36 54 48 53 47 ...
Page 330: ...D 43 24 15 123 127 126 130 126 130 13 73 70 54 48 53 47 71 72 ...
Page 334: ...D 43 28 13 15 74 73 70 69 ...
Page 337: ...D 43 31 ...
Page 338: ...D 43 32 13 15 74 73 70 69 ...
Page 340: ...D 43 34 13 15 11 ...
Page 342: ...D 43 36 13 11 15 69 75 ...
Page 362: ...E 13 14 Symbol Meaning Outer auger bearing Auger end bearing ...
Page 379: ...E 13 31 Symbol Meaning RL Extension pipe left RR Extension pipe right RL RR ...
Page 412: ...E 13 64 ...
Page 418: ...F 29 4 ...
Page 419: ...F 33 1 F 33 Maintenance conveyor 1 Maintenance conveyor ...
Page 426: ...F 33 8 ...
Page 427: ...F 40 1 F 40 Maintenance auger assembly 1 Maintenance auger assembly ...
Page 439: ...F 41 1 F 41 Maintenance auger assembly 1 Maintenance auger assembly external drive version ...
Page 480: ...F 53 18 ...
Page 514: ...F 55 34 ...
Page 515: ...F 61 1 F 61 Maintenance hydraulic system 1 Maintenance hydraulic system ...
Page 531: ...F 72 1 F 72 Maintenance travel drive steering 1 Maintenance travel drive steering ...
Page 542: ...F 72 12 ...
Page 543: ...F 83 1 F 83 Maintenance electrical system 1 Maintenance electrical system ...
Page 552: ...F 83 10 Fuses in terminal box B 15 10 15 25 15 10 15 25 15 10 10 15 25 15 15 10 25 10 ...
Page 555: ...F 83 13 Relays in terminal box C 15 10 15 25 15 10 15 25 15 10 10 15 25 15 15 10 25 10 ...
Page 557: ...F 83 15 Relays in the engine compartment E K 0 Engine start ...
Page 558: ...F 83 16 ...
Page 566: ...F 90 8 ...
Page 567: ...F 100 1 F 100 Tests stopping 1 Tests checks cleaning stopping ...
Page 581: ...F 115 3 2 1 6 5 7 4 3 6 8 9 ...
Page 588: ...F 115 10 ...
Page 590: ...www dynapac com ...