LIQUID SYSTEM VALVES
LIQUID SYSTEM VALVES
Boom Sprayer 9500 / 9600
Page 81
LIQUID SYSTEM VALVES
Agitation
The front valve controls the agitation circuit.
Move the handle at right angles to the line to
stop the agitation. Move the handle parallel
to the line for maximum agitation.
It is recommended that the handle be set to
provide partial agitation to the system during
operation.
Provide higher rates of agitation if using
powders.
Rinse
The second valve controls the tank rinse
circuit. Move the handle parallel to the line to
turn the tank rinse or wash circuit on. Move
the handle at right angles to the line to turn
the rinse circuit off.
Summary of Contents for 9500
Page 1: ...9500 9600 60 132 BOOM SPRAYER OWNER S MANUAL...
Page 2: ...820083 9500 9600 60 132 Boom Sprayer 2023 11 21...
Page 9: ...Table of Contents Boom Sprayer 9500 9600 Page 9...
Page 38: ...SAFETY SAFETY Boom Sprayer 9500 9600 Page 38...
Page 39: ...SAFETY SAFETY Boom Sprayer 9500 9600 Page 39...
Page 40: ...SAFETY SAFETY Boom Sprayer 9500 9600 Page 40 Decal Images...
Page 41: ...SAFETY SAFETY Boom Sprayer 9500 9600 Page 41...
Page 42: ...SAFETY SAFETY Boom Sprayer 9500 9600 Page 42 Wheel and Tracks...