Fast & Fluid Management B.V. – SK450 / SK550
V.
04
‐
2013
P6
Installation
Step 1 - Unpack the machine and unlock the frame lock
>
>
Remove box and plastic
foil. Note the frame lock
bolts on either side of the
machine.
Remove both bolts with a size
17 fork wrench.
By removing the bolts, the
frame lock’s wooden block is
released.
Be careful not to damage the body and surfaces of your SK450 /
SK550 with any tools while unpacking it. Take care not to accidentally
close the door before finishing installation, as it can then only be
unlocked power on the machine.
Step 2 - Remove the frame lock
>
>
Pull out cord to
remove frame lock’s
loose parts.
Ensure all loose parts
have been removed – two
bolts and two wooden
blocks.
Connect the SK450 /
SK550 to the power
mains before closing the
door.
Attention! Failure to remove the frame lock correctly can result in
severe damage to your SK450 / SK550 when in operation. Please take
care!
Please take care to store the frame lock for later use, it is essential for
correct transportation.
Summary of Contents for SK450
Page 1: ...Fast Fluid Management B V SK450 SK550 V 04 2013 P1 FAST FLUID MANAGEMENT SK450 SK550 ENGLISH...
Page 19: ...Fast Fluid Management B V SK450 SK550 V 04 2013 P19 Electrical wiring diagram...
Page 21: ...Fast Fluid Management B V SK450 SK550 V 04 2013 P21 Fast Fluid 2013 www Fast Fluid com...