
MP3020
INSTALLATION MANUAL - EN
Edition 1.0 May 2021
Pag. 9 di 12
2.4.4
Electrical drawing – ceiling mounting without transformer
2.5
WALL MOUNTING
Warnings for electrical danger and fall of suspended masses
The device must be installed by specialized tecnicians
The power supply in the room where the fitting must be installed must be always switched off.
Before starting the installation take care that the ceiling is suitable to bear the load of the application and light.
The anchor bolts provided with the application must be used only with the following base materials: concrete,
natural stone.
Maximum load applicable: 70 kg
See table 1) the electrical requirements of the power supply.
Stricly comply with the minimum heights shown below.
1. Cap
2. Screw
3. Wall application
4. Wall plugs
5. Electrical connector
6. Connector cover
7. Carter
8. Screws
9. Washer
10. Cable fairlead
A.
Once the fastening point has been established with reference to the center of the chair (See fig.A-B), make three
holes on the wall of diameter D 14 in correspondence with the holes in the wall application (3), paying attention to
the perpendicularity between hole and wall.
B.
Insert the three wall plugs (12) into the holes made in A the screws (2) with the special hexagonal key (support
accessories), taking care not to crush the wire between the wall application (3) and the wall itself.
C.
Apply the three Caps (4) to the holes in the wall application (3).
D.
Unscrew the screw (8). Remove the cover (7), insert the lamp in the ceiling application by greasing the pin.
Summary of Contents for MP3020
Page 1: ......