13
Revision date: 01.14.21
115141
chalk line
STEP 3: Center of Tee
STEP 3
6
Assembly Instructions
ASSEMBLE AND ATTACH PVC DRAIN MANIFOLD
Complete these steps:
1. Cut one 6" tube from the 2" pvc tube (111560Z5). Apply pvc
primer and pvc cement to tube end and fitting. Slide into tee fitting.
Repeat to attach remaining section of pvc tubing to tee fitting.
Allow cement to set then continue.
2. Snap assembly into clamps on frame. Position tee at low end.
Long tube is cut to length later.
ATTENTION:
Position tee fitting next to hanger installed lowest on
frame. See A position on previous page if needed. Manifold should
slope toward tee fitting.
3. With outlet of tee fitting point straight down, mark center of tee.
Snap a line end-to-end. From first mark, mark three (3) additional
locations at 10" on-center. There will be four (4) marks.
4. Using a 1-3/8" hole saw, drill a hole at each mark. Do not apply
too much pressure on tube. Doing so may damage clamps. Place
a support under pvc tube during drilling, or remove manifold from
clamps and drill on a bench.
5. Once holes are drilled, cut long tube to the desired length. Allow
room to install both end caps.
Clean the tube.
6. Add one WF6717 cap to each end of the manifold.
Do not
cement these to the manifold.
They are removed during routine
cleaning and maintenance.
7. Continue with the next procedure.
chalk line
STEP 4
Step 5:
Cut the long manifold tube so
it extends through clamp, but remains
shorter than frame cross support. End
cap should be flush with end of cross
support when installed.
Long Manifold Tube
STEP 1
Drain Manifold Assembly
Press against hanger to
lock assembly in place.
STEP 2
STEP 1
WF1386
STEP 6
WF6717