
5
Revision date: 09.21.18
113542
General Frame Assembly Information
1
LOCATE AND SEPARATE FRAME COMPONENTS
Your 113542 Fodder Pro 3.0 commercial
fodder system consists of two (2) frame
sections (or pods): one (1) pod two (2) trays
wide; one (1) pod five (5) trays wide. Both
pods have seven (7) evenly spaced levels.
Consult the diagrams on the following
pages to better understand the basic layout
before you begin. Follow these basic steps
to assemble and set the frame for each
fodder section.
ATTENTION:
A solid, level surface such as
concrete capable of supporting the frame
and fodder is required. If a full concrete
slab is not part of the building, install
concrete blocks or pavers, or pour small
concrete slabs level with the finished grade
to support the frame tubes.
1. Review the diagrams to determine the
overall footprint of this system and
prepare the site for frame assembly.
See diagram.
2. Begin by separating the steel frame
tubes according to part number and
length. Each tube has a specific
position on the frame.
3. Next, review the diagrams on the
following pages to further divide the
tubes by selecting those to construct
the
14-tray pod
. The remainder of the
tubes are used for the
35-tray pod
.
psi
0
40
20
60
80
10
0
Fodder Tray
On-Floor Drain
Channel
35-Tray Pod
14-Tray Pod
Supply
Manifold
Downspout
with elbow.
Frame
Levelers
Gutter at
each level.
2 Cable
Assemblies
per Pod