24
24
113542
Revision date: 09.21.18
ps
i
0
40
20
60
80
10
0
ps
i
0
40
20
60
80
10
0
8d
The following diagrams show one way to attach the horizontal branch tubes to the manifold.
Personal preference and experience may affect how you complete the installation. Review
all diagrams that follow and continue by installing the manifold branch tubes.
3
Install Manifold Branch Tubes
INSTALL MANIFOLD BRANCH TUBES—continued
INSTALL BRANCH HANGERS—113100
1. Hook hanger ends under branch
tube. Bend hanger as needed to
place hanger ends as shown.
3. Hook hanger over top of frame
tube and gently pull down to seat
hanger in place.
2. Seat tube tightly in hanger. Hanger
hooks are outside of the drippers.
4. Verify that hanger hooks are
positioned outside of each dripper
as shown.
2
Install hangers. See
procedure—upper right.
Slide manifold up
or down to level
branch tubes.
ps
i
0
40
20
60
80
10
0
1
ATTENTION:
During hanger
installation, ensure that the
horizontal tubes remain level.
Adjust manifold up or down
as needed. Release pipe
hangers for easier adjustment.
Exercise caution! Drippers
are fragile.
Level
Slide manifold up
or down to level
branch tubes.
Install wire hanger
between the trays.
Place trays in
position as guides,
or measure to
ensure correct
hanger placement.
2-Tray Pod
5-Tray Pod
Repeat all steps as needed to install all
remaining branch tubes and hangers.