88
111628M
Revision date: 09.25.18
1
ASSEMBLE MAIN FRAME: Support Frames
Gather the parts and complete the steps that follow to
assemble the two (2) support frames.
Required parts for
each support frame
:
• (1) Assembled base rail (from previous page)
• (4) 104627 4-Way Connectors
• (1) S15P048 Square Tube (plain) for vertical support
• FA4482B Tek Screws and 100441 Magnetic Nut Setter
ATTENTION:
Install Tek screws as shown for best results and a uniform
appearance.
Review all diagrams for clarification.
Complete these steps:
1. Take the S15P048 tube and slide one 4-way connector onto one end.
Slide the end of the tube into the 3-way connector of the base rail and
secure using two (2) Tek screws (Fig 1).
2. Using the diagram to the right, position the 4-way connector as shown
and secure to the vertical tube using two (2) Tek screws (Fig. 2).
3. Move to the top of the vertical tube and slide three (3) more 104627
connectors onto the tube (Fig. 3).
4. Using the diagram to the right and in the Quick Start section, space each
connector on the tube and secure using two (2) Tek screws (Fig. 4).
5. Repeat the steps to assemble the remaining support frame.
6. Continue with the next procedure.
Assembly Instructions
8" between
connectors.
This level only.
FA4482B
Tek Screws
S15P048
9-3/4" between
connectors.
Assembled Base Rail with Levelers
FIG. 1
FIG. 3
FIG. 4
FIG. 2