background image

3

CANOPIES

Revision date: 07.21.09

ASSEMBLY PROCEDURE 

Following the instructions as presented will help ensure 

the proper assembly of your shelter. Failing to follow these 

steps may result in an improperly assembled and anchored 

shelter and will void all warranty and protection the owner 

is entitled. 

The steps outlining the assembly process are as follows:
1.  Verify that all parts are included in the shipment. Notify  

Customer Service for questions or concerns.

2.  Read these instructions, the Must Read document, and  

all additional documentation included with the shipment  

before

 you begin assembling the shelter.

3.  Gather the tools, bracing, ladders (and lifts), and  

assistance needed to assemble the shelter. 

4.  Check the weather 

before

 you install the roof cover 

and any panels (if equipped). Do not install covers or 

panels on a windy or stormy day.

5.  Re-evaluate the location and site based on the  

information and precautions presented in the  

documentation included with the shipment.

6.  Prepare the site (if applicable).
7.  Assemble the frame components in the order they are 

presented in these instructions.

8.  Assemble the frame including the struts (if equipped). 
9.  Consult the MUST READ document and properly  

anchor the assembled frame.

10. Install, tighten, and secure the main cover and panels 

(if equipped). This applies to fabric covers that stretch 

over the frame assembly. Your shelter may include roof 

panels or side panels or both.

11.  Read the Care and Maintenance information at the end  

of these instructions.

12. Complete and return all warranty information as 

instructed. 

LIST OF WORDS AND PHRASES

Before you begin, it is important to become familiar with the 

words and phrases used in this instruction manual.

These words and phrases are common to most  

FarmTek® shelters and identify the different parts of the 

shelter. (Some are used in this document. Others may 

not apply to this particular shelter.) These terms describe 

the shipped parts and can also be found on the materials 

list/spec sheets included with the shipment. To aid in the 

assembly, read through the following definitions before you 

begin to assemble your shelter.

• 

Conduit:

 An assembly of pipes used to secure the  

main cover and end panels (if equipped). Purlins and  

some strut assemblies also consist of connected pipes  

to form a conduit. Each pipe joint of a conduit assembly  

is secured with a self-tapping Tek screw.

• 

Coupler or Fitting:

 A part of the frame assembly 

where legs, purlins and rafter pipes are inserted and  

secured. In most instances, 3-Way and 4-Way couplers  

are used. In some larger applications, couplers are  

used to secure the joints of the different rafter sections 

 

during the assembly of the rafters. Some shelters do 

not use couplers.

• 

Foot or Rafter Foot:

 The part attached to and found 

at the base of the rafter or leg of the shelter.  

Depending on the shelter, the foot is an optional  

purchase. Some shelters do not offer an optional foot. 

 

Some use 1-Way connectors; others use ground posts. 

• 

Must Read Document:

 This document includes 

building and shelter anchoring instructions, steps for  

end wall reinforcement, safety precautions, and notices  

and warnings. The Must Read document is sent with all  

shelters and buildings. If you did not receive a Must  

Read document, contact Customer Service to request  

one. 

• 

On-Center:

 Term used to describe a measurement 

taken from the vertical center of the rafter or frame 

member to the vertical center of another.

• 

Purlin:

 The pipe assembly that runs perpendicular to  

the rafters or framework that supports the main cover.  

Purlins are found on the sides and roof areas of the  

assembled frame, are evenly spaced, and typically run  

from the front to the back of the shelter.

• 

Plain or Straight Pipe:

 A term used to describe a pipe  

that has the same diameter or width throughout its 

entire length. 

• 

Strut:

 A strut is usually a length of pipe with two  

flattened ends and is used for diagonal bracing of the 

 

shelter frame. A strut is typically secured to the frame 

work by special brackets and bolts.

• 

Swaged End or Swaged Pipe:

 The term “swaged”  

refers to the tapered end of the pipe or tube. Swaged 

ends of a pipe can be inserted into couplers and the  

straight ends of other pipes. 

• 

Tek screw:

 A self-tapping fastener used to secure pipe  

joints and to fasten brackets to rafters.

Summary of Contents for 1020SPC

Page 1: ...Revision date 07 21 09 2009 FarmTek All Rights Reserved Reproduction is prohibited without permission Sunblocker Shade House 10 Wide Photo may show a different but similar model STK DIMENSIONS 1020SPC 10 W x 20 L ...

Page 2: ... and may cause serious injury and damage LOCATION Choosing the proper location is an important step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure under power lines Identify whether underground cables and pipes are present before preparing the site or anchorin...

Page 3: ... assembly read through the following definitions before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels if equipped Purlins and some strut assemblies also consist of connected pipes to form a conduit Each pipe joint of a conduit assembly is secured with a self tapping Tek screw Coupler or Fitting A part of the frame assembly where legs p...

Page 4: ...nents consult the Quick Start diagrams at the back of these instructions Continue with FRAME ASSEMBLY procedures that follow UNPACK AND IDENTIFY PARTS The following steps will ensure that you have all the necessary parts before you begin to assemble the shelter 1 Unpack the contents of the shipment and place where you can easily inventory the parts Refer to the Bill of Materials Spec Sheets 2 Veri...

Page 5: ...rews are sent with all shelters of this type For couplers with locking eyebolts install the Tek screws at each pipe connection for additional security if desired WARNING To prevent personal injury and damage to the shelter fasten and tighten a Tek screw at each pipe and coupler joint To prevent cover damage install the Tek screw so that it does not touch the main cover or any optional side or end ...

Page 6: ...cking eyebolts secure each pipe in the coupler using a Tek screw 3 Secure each purlin pipe joint with a Tek screw and then tape the screw to protect the cover when it is installed ATTENTION Position Tek screws so they will not touch the main covers or side panels if equipped when these are installed Pipe Identification Assembly Pipe Quantity Rafter Leg 131P068 1 Purlin 131P068 131S052 1 each Purli...

Page 7: ... cover to the assembled frame See the above insert Use one snugger ball for each grommet 3 Once the main cover is installed unfold the optional side covers additional purchase required along the frame and attach them to the main roof frame using the snugger balls The dashed line in the diagram below shows where to attach the side cover 4 Read the Care and Maintenance section that follows WARNING T...

Page 8: ... that will not damage the cover when removing debris Remove snow to prevent excess accumulation Use tools that will not damage the cover when removing snow Check the contents of the shelter to verify that nothing is touching the cover that could cause damage Check the anchoring system to ensure that all components are tight and in good repair If the shelter is moved inspect all parts and connectio...

Page 9: ...9 CANOPIES Revision date 07 21 09 QUICK START GUIDE 10 Wide Sunblocker Shade House Sidewall 10 5 3 4 Height Width 5 7 7 8 8 10 5 8 Height Grid Represents 12 Squares FRONT ...

Page 10: ...CANOPIES 10 Revision date 07 21 09 FRONT PROFILE 131P068 131P068 102191 102191 131P068 102191 ...

Page 11: ...11 CANOPIES Revision date 07 21 09 SIDE PROFILE 131P068 131S052 10 0 Length ...

Page 12: ...ision date 07 21 09 CONNECTIONS 102191 Rafter Purlin View 2 Mid Rafter Purlin Connection 102192 Purlin Rafter End Rafter Purlin Connection View 1 View 1 End Rafter Purlin Connection Mid Rafter Purlin Connection View 2 ...

Page 13: ...13 CANOPIES Revision date 07 21 09 Space below is reserved for customer notes ...

Reviews: