background image

OZARK DOOR CANOPY

ASSEMBLY INSTRUCTIONS

Recommended Tools:

Level, Pliers, 3/8" Electric Drill, Carpenters Square, Tape Measure, Metal Hack Saw,
Silicone Caulking, Screw Drivers (Regular & Phillips)

Before You Begin:

1.)  Please read all instructions carefully.  Check the Bill of Materials for any missing parts,

and gather all necessary tools.  The paint finish can be scratched so place materials
on tarp or cardboard to prevent scratching.

2.)  Note that this patio cover kit is not designed to carry additional loads such as hanging

plants, swings, people, trellis's, or other objects.

Rev'd. - 7/07/09

Summary of Contents for OZARK

Page 1: ...Before You Begin 1 Please read all instructions carefully Check the Bill of Materials for any missing parts and gather all necessary tools The paint finish can be scratched so place materials on tarp or cardboard to prevent scratching 2 Note that this patio cover kit is not designed to carry additional loads such as hanging plants swings people trellis s or other objects Rev d 7 07 09 ...

Page 2: ...10 Scupper 11 1 1 2 Lag Screw 8 Bottom Post Bracket 4 Front Gutter 12 8 32 x 1 2 Bolt Nut Washer 14 8 x 3 4 Tek Screw OZARK DOOR CANOPY PARTS LIST 5 Side Fascia 13 14 x 3 4 Tek Screw with Washer 9 Corner Cap 7 Top Post Bracket Contact Us at 800 851 0865 or www americana com ...

Page 3: ...mension of 1 4 holes is determined by location of wall studs or other structural member that the awning must be anchored to Do not attach awning to sheeting siding flashing or any other non structural surface After the mounting channel is installed apply caulk to the hinge to prevent water leaks Mark a level line a minimum of 5 1 2 above out swinging door Align holes in awning rail with level line...

Page 4: ...Cut post to proper length Posts must reach from front gutter at desired angle back to the structure Be sure to give the cover a subtle slope to drain water towards the front gutter Slide post and bracket into bottom side of gutter and arrange posts spaced evenly from the ends of the gutter see Fig 2 2 Open part of post bracket must face upwards toward the cover ...

Page 5: ...hed to the wall channel see Fig 3 1 Do not secure front half of roof panels to gutter until all roof panels are attached to wall channel Working from underneath attach roof panels to the wall channel with 8 32 x 1 2 bolt with nut and washer see Fig 3 2 After rook panel is secure apply silicone to four faces of the styrofoam flashing plug and fit it between the mounting channel and roof panel see F...

Page 6: ...screws see Fig 4 2 Determine where you want the water to run from unit Mark and drill several small holes in bottom of gutter forming a pattern no bigger than 2 x 3 With a saw remove the material between holes to create one larger hole Apply silicone to flange of scupper attach to gutter with 2 8 x 3 4 Tek Screws covering large hole see Fig 5 1 Corner Cap 8 x 3 4 Tek Screw Fascia Fascia 8 x 3 4 Te...

Page 7: ...ing 1 8 x 1 3 4 Bolt w Wing Nut see Fig 6 2 NOTE Be sure to square post brackets with building and post spacing see Fig 6 1 Fig 6 1 8 x 1 3 4 Bolt w Wing Nut 1 1 2 Lag Bolt Typ Anchors if Req d Bottom Post Bracket ASSEMBLY COMPLETED Other Products Available from Americana Fabric Aluminum Awnings Carports Patio Covers Room Enclosures Park Shelters Check Out Our Web Site www americana com ...

Reviews: