CANOPIES
6
Revision date: 07.21.09
Sunblocker Shade House
ASSEMBLE THE MAIN FRAME
This section is an overview of the process for assembling
your roof frame. See illustration below to identify main parts
of the frame.
1. Locate the required couplers and pipes and assemble
the roof frame as shown below.
2. Secure each pipe in the coupler using the locking
eyebolt. If the couplers are not equipped with locking
eyebolts, secure each pipe in the coupler using a Tek
screw.
3. Secure each purlin pipe joint with a Tek screw and then
tape the screw to protect the cover when it is installed.
ATTENTION
: Position Tek screws so they will not touch
the main covers or side panels (if equipped) when
these are installed.
Pipe Identification
Assembly
Pipe
Quantity
Rafter & Leg 131P068
1
Purlin
131P068 & 131S052
1 each
Purlin
Rafter
Rafter
Purlin
Leg
ATTENTION:
Customer can assemble frame as
desired. One suggested method is to assemble the
entire roof section of the shelter first. The frame is
then lifted and the legs added.