FARMI 260
18
max 35 kg
A
B
max 22 kg
B
A
MOUNTING OF THE DISCHARGE PIPE
•
For the installation of the discharge pipe, always
use a support of approx. 60 cm height. It is prohi-
bited to climb onto the chipper!
•
When installing a long discharge pipe, the pipe
must be arranged in its transport position. Two
workers are needed for installation.
•
Before installing the discharge pipe, place the lock
band under the connecting piece of the chipper.
•
While standing on the support, lift the discharge
pipe to the correct position.
•
At the bottom, press the discharge pipe against
the connecting piece.
•
Carefully tighten the bolt on the lock band to
prevent the pipe from rotating during operation.
Insert the cotter pin.
If the chipper is equipped with an optional discharge
pipe control device, the latter must be mounted on
the chipper before the discharge pipe. First, the cont-
rol device is mounted to the chipper using the lock
band and then the discharge pipe is installed to the
control device as described above.
ADJUSTING THE DISCHARGE PIPE AND LID
•
Open the band tightening bolt. Turn the pipe in
the desired direction. Tighten the bolt.
•
Adjust the lid by changing the chain length.
Tighten
the lock bands
carefully.
UNSTABLE
When swiveling the long dischar-
ge pipe into the transport/ope-
ration position, exercise extreme
caution.
Please note the force required!
Direct the discharge pipe so that
the thrown out chips do not pose
a risk to the operator of the chip-
per or to or anyone else. Always
keep a safe distance to the di-
scharge position of the chips.
WARNING!
!
!
DANGER!