
Manual
FALCON SW
18
│
80
2. Connecting the pressure hose
Connect the pressure hose (outer
⌀
22 mm) with the small quick coupling to the tractor distributor.
Connect this hose to the circuit giving priority to the oil supply.
Picture 8 – Pressure hose connection
3.5.3
Commissioning
-
When setting the required fan revolutions, the hydraulic oil must be warmed up.
-
When commissioning the hydraulic drive, the fan revolutions (working air pressure on the pressure
gauge in the hopper) must be set gradually.
-
Fan revolutions (pressure on the pressure gauge) are set by regulating the oil flow rate in the tractor.
-
If the hydraulic drive is started with cold oil, it is necessary to increase the motor revolutions gradually
before the oil warms up.
-
During commissioning and the first handover, the technician in charge of the handover must inspect all
connections of the hydraulic drive and measure pressure in the outlet hose. He must record the
obtained results in the handover protocol.