![Farmers Friend Haven HIGH TUNNEL Assembly And Instruction Manual Download Page 30](http://html1.mh-extra.com/html/farmers-friend/haven-high-tunnel/haven-high-tunnel_assembly-and-instruction-manual_4592659030.webp)
28
28
Well-designed, quality tools and equipment
Well-designed, quality tools and equipment
|
| farmersfriend.com
farmersfriend.com
1.
Assemble roll-up bar and place on top of the eyebolts along the baseboard. No screws are
No screws are
needed at this point.
needed at this point.
2.
Center the bar on the tunnel leaving 2–3 inches sticking out at each end of the tunnel for later
attaching the hand cranks.
S T E P 2 5
S T E P 2 5
Roll-up Bar Assembly
Roll-up Bar Assembly
fmfr.io/haven/25
Summary of Contents for Haven HIGH TUNNEL
Page 2: ...Rev 20231004...
Page 42: ......
Page 43: ......
Page 44: ...200 Good Life Way Centerville TN 37033 support farmersfriend com 931 583 0397...