GB
14
KJ 60
750313 - KJ60 – rev 22 - ( 04-2019 )
25 mm.
25 mm.
Click!
CHANGE OF SIZE
Depending on insert thread, it is necessary to replace the couple “tie-rod/head” as follows:
PICTURE 1.
Loosen the ring nut by means of a 25-mm standard spanner and remove the riveting tool head.
PICTURE 2.
Make the pin supplied pass through the pertinent service hole located on the cone carrying head and apply a light
pressure on the head inwards, in order to dechuck the tie rod clutch., at the same time, unscrew the tie rod and extract it.
PICTURE 3-4.
Keep the clutch dechucked and screw the tie rod size desired. When the replacement of the tie rod has been
performed, swing it until you hear a click. Them assembly the proper head and lock it with the corresponding ring nut loosen
before. Each time you carry out any change of size, repeat the adjustment operations as specified in the previous pages.
WARNING!
Desconnect air feed when performing those operations.
1
3
2
4
Summary of Contents for KJ 60
Page 4: ......
Page 39: ...RUS 39 KJ 60 750313 KJ60 rev 22 04 2019 M8 G G G h H H G...
Page 40: ...RUS 40 KJ 60 750313 KJ60 rev 22 04 2019 25 mm 25 mm Click Click 1 3 2 4 1 25 2 3 4...
Page 47: ...47 750313 KJ60 rev 22 04 2019 KJ 60...
Page 72: ...RUS 72 KJ 60 750313 KJ60 rev 22 04 2019...
Page 74: ......
Page 75: ......