Cement Curing Autoclave User Manual
100072577
Revision H
43
5.9
Ending the test
5.9.1
When the required curing period has ended, cool the sample and
chamber, maintaining pressure, according to “Curing at Pressures Above
Atmospheric” in API RP 10B.
5.9.2
At the specified time (see “Curing at Pressures Above
Atmospheric” in API RP 10B), when the chamber has cooled, slowly
release all remaining pressure by opening the needle valve.
Hot water and/or steam may be violently expelled when the
needle valve is opened. Keep all body parts clear of the valve
outlet when it is being opened.
5.9.3
Turn the heat switch to the OFF position.
5.10
Remove the chamber
5.10.1
Disconnect the cable from the thermocouple and lay the cable
aside.
5.10.2
Remove the pressure manifold assembly and lay it aside.
5.10.3
If previously removed, re-attach the carrying handle and lift the
chamber clear of the heating jacket and move it to the desired work area.
5.10.4
Unscrew the chamber lid using the wrenches provided. Remove
the chamber lid and set it aside.
5.10.5
Remove the molds from the chamber using the mold lifting tool.
5.10.6
Follow the procedures in “Curing at Pressures Above Atmospheric”
in API RP 10B to remove the cured cement specimens from the molds,
process, and test them.