background image

- 3 -

Tank filling

Wiring diagram

Summary of Contents for PZ-829 RC

Page 1: ...o sition 11 10 whereas the MAX into position 8 7 Electrode probe connected with a cable with a wire dia meter of up to 1 mm and a maximum length of 100 m Purpose Functioning F F Filipowski sp j Konstantynowska 79 81 95 200 Pabianice POLAND phone fax 48 42 215 23 83 48 42 227 09 71 www fif com pl e mail biuro fif com pl Donotdisposeofthisdeviceinthetrashalongwithotherwaste According to the Law on W...

Page 2: ...obes at heights corresponding to the fluid control levels 6 Connect the MAX relay contact in series into the power supply circuit of the draining device terminals 8 7 7 Connect the MIN relay contact in series into the power supply circuit of the filling device terminals 11 12 8 Set the sensitivity with the knob Terminals 4 5 6 separated from the network Diagram Mounting ...

Page 3: ... 3 Tank filling Wiring diagram ...

Page 4: ... 4 Tank emptying ...

Page 5: ...power signalling green LED work status signalling 2 red LED power consumption 1 1 W working temperature 25 50 C terminal 2 5 mm screw terminals cord 4 0 mm screw terminals wire tightening torque 0 5 Nm dimensions 3 modules 52 5 mm mounting on TH 35 rail ingress protection IP20 type of flood probe 3 PZ2 probe current 0 13 mA sensor voltage 6 V separation of measuring probes galvanic transformator T...

Page 6: ...p j declares that the device is in conformity with the essential requirements of The Low Voltage Directive LVD 2014 35 EU and the Electromagnetic Compatibility EMC Directive 2014 30 UE The CE Declaration of Conformity along with the references to the standards in relation to which conformity is declared can be found www fif com pl on the product subpage Warranty CE declaration E200527 ...

Page 7: ......

Reviews: