41
INSTALLATION
Check the appliance is electrically safe and gas sound when you have finished.
Final Checks
Hob Check
Check each cooking zone in turn. Be sure to use pans of the
correct size and material.
Grill Check
Turn on the grill control and check that the grill heats up.
Oven Check
Set the clock as described earlier, and then turn on the ovens.
Check the oven fans start to turn and that the ovens heat up.
Final Fitting
Fitting the Plinth
Loosen the 3 screws along the front bottom edge of the
cooker. Twist and fit each end keyhole over their respective
screws. Tighten the fixing screws (
Fig. 8.17
).
Customer Care
Installer
: Please complete your details in this guide, inform
the user how to operate the cooker and hand over the
instructions.
ArtNo.350-0012 - Securing the plinth
Fig. 8.17
Summary of Contents for Nexus 110 Induction
Page 1: ...USER GUIDE INSTALLATION INSTRUCTIONS Nexus 110 Induction Steam Australia U111144 02 ...
Page 2: ......
Page 4: ...ii ...
Page 54: ......
Page 55: ......
Page 56: ...Clarence Street Royal Leamington Spa Warwickshire CV31 2AD England www falconworld com ...