background image

Specifications and descriptions in this document  

are subject to change without notice. 

© Protocol Insight, LLC 2017, 2018 

Revision 1.2, February 22, 2018 

P a g e

 | 

4

 

Exerciser: How to connect to your device and operate the exerciser 

Step 1: Connect the SMA cables for exerciser use 

Follow the instructions for the Analyzer above, but change the SMA cable connections by replacing C and 
D from Step 1 above above with E and F below. 

E.

 

Connect to the RxDN  from the device M-Rx lane 1. Connect to the RxDP  from the device M-
Rx lane 1

. This is the “Down” direction. This is used for the 

exerciser only, for the analyzer 

these connectors are not used.  

F.

 

Connect to the RxDN  from the device M-Rx lane 0. Connect to the RxDP  from the device M-
Rx lane 0

. This is the “Down” direction. This is used for the 

exerciser only, for the analyzer 

these connectors are not used. 

Step 2: Device Configuration of DUT UniPro link 

A  UniPro  link  connection  between  the  exerciser  and  DUT  is  required  for  the  exerciser  to  perform 
compliance/conformance (CTS) testing, corner case, margin or automated stress testing.  

1.

 

Press the “

Boot

” button in the 

tool bar to boot the device to UniP

ro. Pressing the “Boot” button 

will initiate the Link Startup Sequence. 

Step 3: Configure Tests 

1.

 

Select either CTS or ExAnalyzer mode. 

2.

 

Go to the CTS Configuration or Exerciser & TV Configuration window. 

3.

 

Select which Speeds and Link Widths to test. 

4.

 

Select which test Categories and Tests to run. 

 

Step 4: Configure Stress Testing 

1.

 

Test Run Order controls the order in which tests are executed. 

a.

 

Loop Order: loop order specifies the nested order of test execution.  Tests will be run from 
the bottom up, with all tests in each loop executed before the next higher loop is begun. 
Loop order is adjusted by dragging categories up or down in the Loop Order box. 

b.

 

Ascending, Descending, Random Seed: this specifies which order the tests are executed 
within the Loop. 

Step 5: Configure Run Control 

Specify the number of iterations of the test configuration to run with Test Run Control. Test execution will 
stop after the Number of Loops (outer loops on Test Run Control) or No Result Test Cases have occurred. 

Step 6: Run the configured tests 

Press the Start or Start CTS button to run the configured tests. 

Reviews: