![Faber Glance Installation Manual Download Page 15](http://html.mh-extra.com/html/faber/glance/glance_installation-manual_535907015.webp)
L
14 <
<
<
<
7.4
Checking the flame picture.
Allow the applaince to burn for at least 20 minutes at full and then check the flame
picture for:
1.
Distribution of the flames
2.
Colour of the flames
If either one or both points are unacceptable, then check:
The positioning of the imitation logs and/or the quantity of pebbles or chips on the
burner.
The connections of the Flue materials for leakage (in case of blue flames)
Whether the correct flue restrictor has been mounted
The outlet .
o
Wall terminal is installed correctly
o
Roof terminal is fitted and sited correctly
The flue system is correctly calculated
8
Instructing the client
Recommend that the appliance be serviced annually by a competent person in
order to guarantee a safe use and a long lifespan.
Advise and instruct the client about maintenance and cleaning of the glass.
Emphasize the risk of burning in fingerprints.
Instruct the client about the operation of the appliance and the remote control
unit, including the replacement of the batteries and adjusting the receiver for
initial use.
Hand over to the client:
o
Installation manual
o
User’s manual
o
Imitation logs instruction card
o
Suction lifters
Summary of Contents for Glance
Page 1: ...Glance 40010576 0951 Installation guide ENG ENG ...
Page 2: ...L 1 1 1 1 2 1 3 1 4 1 5 A ...
Page 3: ...L 2 2 1 2 2 2 3 2 4 B 1 2 A ...
Page 4: ...L 3 2 5 2 6 110mm 3 1 3 2 ...
Page 21: ...L 20 14 Dimension of the appliance ...
Page 22: ...L 21 15 Dimension of the appliance with frame ...
Page 23: ...L 22 16 Ventilation Grills ...
Page 24: ...L 23 17 Dimension Service Hatch ...
Page 25: ...24 L ...