![background image](http://html1.mh-extra.com/html/faac/parqube-fc/parqube-fc_use-and-maintenance_3109427026.webp)
26 / 36
Ver. 1.0 - July, 2015 - En
5.3 servIce and MaIntenance PlannInG systeMs
The following table indicates the maintenance intervals within which you must perform the individual maintenance opera-
tions for each peripheral in use.
Maintenance operations specified for six-month intervals shall be carried out only by qualified service technicians of HUB
Parking Technology, who are properly trained and in possession of the necessary documentation.
t
he information specified below is given as a recommendation. The maintenance intervals depend
significantly on the conditions of use. In the event of visible signs of deterioration in operation,
or more frequently than normal use of the parking system, you should plan maintenance work at
shorter intervals.
5.3.1 Peripheral
type of activity
frequency
Minimum level
of competence
Cleaning and vacuuming the inside and outside of the chassis of the
peripheral station
As needed or every 6 mon-
ths
Check ticket reading and control of cleaning of the scanner's glass
Every 6 months
P
Check card reading
Every 6 months
P
5.3.2 ticket/receipt printer
type of activity
frequency
Minimum level
of competence
Power supply printer paper of ticket/receipts
As needed
P
Check printing quality
Weekly
P
C
heck quality of ticket cutoff
Monthly
P
Cleaning with compressed air
Once every 8 weeks
P
Summary of Contents for ParQube FC
Page 2: ......
Page 6: ...6 36 Ver 1 0 July 2015 En This page intentionally left blank...
Page 7: ...7 36 Ver 1 0 July 2015 En Capitolo 1 Graphic conventions...
Page 11: ...11 36 Ver 1 0 July 2015 En Capitolo 2 General Conditions...
Page 13: ...13 36 Ver 1 0 July 2015 En Capitolo 3 Product Description...
Page 18: ...18 36 Ver 1 0 July 2015 En This page intentionally left blank...
Page 19: ...19 36 Ver 1 0 July 2015 En Capitolo 4 Use...
Page 22: ...22 36 Ver 1 0 July 2015 En This page intentionally left blank...
Page 23: ...23 36 Ver 1 0 July 2015 En Capitolo 5 Maintenance...
Page 32: ...32 36 Ver 1 0 July 2015 En This page intentionally left blank...
Page 33: ...33 36 Ver 1 0 July 2015 En Capitolo 6 Declaration of Conformity...
Page 35: ...35 36 Ver 1 0 July 2015 En This page intentionally left blank...
Page 36: ...HUB Parking Technology a Business Unit of the FAAC Group www hubparking com...