background image

8

2

3

1

Tr

ansla

tion of the original instruc

tions

ENGLISH

2.4  ELECTRICAL WIRING

To connect the bollard, use a multi-pole cable such as 

FG7OR-0.6/1kV-

16G1.5 (16 wires of 1.5mm2) between bollard and control board 

and a 

FG7OR-0.6/1kV-3G4 cable (3 wires of 4 mm2) for the motor power supply, 
both

 

measuring a maximum of 50 metres in length.

The cables must be laid inside a sheath of Ø50mm and passed through 
the cable guides provided on the pit sheet (

8

-

1

) and through the 

two corrugated conduits supplied with the pit.
Pass the wires through on the guides on the bollard frame as per as 

8

-

then connect the corrugated conduits to the supports on the 

bollard frame, as indicated in 

8

-

3

.

Complete the electrical connections in the terminal box at the side 
of the bollard as shown in 

14

.

Any additional accessories (e.g. Open/close buttons, etc.) that are 
connected to the control board must be double insulated.

www.FastGateOpeners.com  |  (800) 878-7829  |  [email protected]

Summary of Contents for J355 HA M50 EFO

Page 1: ...J355HA M50 www FastGateOpeners com 800 878 7829 Sales FastGateOpeners com...

Page 2: ...currently in force 10 Beforeperforminganyoperationonthesystem disconnectthepowersupply 11 The power mains of the automation system must be fitted with a multi pole power switch with a switch contact...

Page 3: ...ards The cylinder is moved by a hydraulic unit inside the structure 1 2 TECHNICAL DESCRIPTIONS AND SPECIFICATIONS 1 Flashing LED 2 Head 3 Cylinder 4 High position magnetic contact N C 5 Junction box 6...

Page 4: ...e C 15 55 Weight of bollard and pit kg 850 bollard 235 pit Oil quantity l 1 6 standard version 6 7 EFO version Ingress protection IP66 Size See 2 Condenser 2 70 F 400V Resistance to breakage J 3 18520...

Page 5: ...STALLATION 2 1 CONFIGURATION A flexible hose with a diameter of 100 mm should be fitted for drainage Dig the hole to a depth of approximately 1 85 m Dimensions in mm UNPROTECTED AREA IMPACT DIRECTION...

Page 6: ...instructions ENGLISH 2 2 CONSTRUCTION OF THE FOUNDATION CAGE Build the foundation cage not supplied by FAAC as shown in 4 using the 12mm and 20 mm iron rods CLASS B450C www FastGateOpeners com 800 878...

Page 7: ...lectronic board 7 Pour class C30 37 concrete around the cage to secure it properly up to about 10 cm from ground level Wait a minimum of 7 days to allow the concrete to cure properly Laythepipingneces...

Page 8: ...0 pursuant to UNI EN 12620 The bollard must only be installed once the concrete has cured for at least 7 days The compaction index of the surrounding soil should be at least 90 of the optimal Proctor...

Page 9: ...ndpassedthrough the cable guides provided on the pit sheet 8 1 and through the two corrugated conduits supplied with the pit Pass the wires through on the guides on the bollard frame as per as 8 2 the...

Page 10: ...d resting it against the coun terframe remove the two eye bolts 11 1 and fix the bollard in place using the 24 TCEI M24x50 screws supplied with the pit IMPORTANT Tighten the screws to a torque of 50Nm...

Page 11: ...rewandremovethefourTORXT30screwssecuringthecover of the hydraulic control unit in place 13 1 4 Remove the cover of the hydraulic control unit 5 Unscrewthelocknut 13 2andloosenthescrew 13 3tomove the c...

Page 12: ...pressure switch EFO solenoid valve Heater optional Refer to the diagram below EFO N O connection activtes also in case of black out EFO N C connection voluntary activation only Before performing any w...

Page 13: ...Y 7 PresstheFbuttonandholditdownwhilstsimultaneouslypressing the button to exit programming screen and save the changes made For more information on programming the equipment please refer to the relev...

Page 14: ...STOP LOOP 1 LOOP 2 LOOP 2 LOOP 1 CLOSE FSW EMERGENCY OUT 1 OUT 2 OUT 3 GND GND 24 V 24 V OUT 3 3 7 11 13 1 dF 06 LO C 3 03 Y 4 LO Cu F F F F F F F F F F 10 s F F 10 s Translation of the original instr...

Reviews: