Road surface

Concrete

Ground

Flexible sheath Ø 50mm

Dimensions in mm

UNPROTECTED AREA

PROTECTED AREA

IMPACT DIRECTION

The foundation concrete can be poured directly into the excavated
hole. Concrete specifications:

- Class C30/37.

- Concrete with aggregate 10-30 pursuant to UNI EN 12620

- The bollard must only be installed once the concrete has cured

for at least 7 days.

The compaction index of the surrounding soil should be at least 90% 
of the optimal "Proctor" curve, pursuant to the UNI EN 13286-2: 
2005 standard.

The steel reinforcement complies with the B450C class (ASTM A615 
Grade 60).

!

Whilst the concrete is curing, insert one or more of contrast supports inside the pit, to prevent the walls from bowing inwards
due to the load of the fresh concrete.

www.FastGateOpeners.com  |  (800) 878-7829  |  [email protected]

Summary of Contents for J355 HA M50 EFO

Page 1: ...J355HA M50 www FastGateOpeners com 800 878 7829 Sales FastGateOpeners com...

Page 2: ...currently in force 10 Beforeperforminganyoperationonthesystem disconnectthepowersupply 11 The power mains of the automation system must be fitted with a multi pole power switch with a switch contact...

Page 3: ...ards The cylinder is moved by a hydraulic unit inside the structure 1 2 TECHNICAL DESCRIPTIONS AND SPECIFICATIONS 1 Flashing LED 2 Head 3 Cylinder 4 High position magnetic contact N C 5 Junction box 6...

Page 4: ...e C 15 55 Weight of bollard and pit kg 850 bollard 235 pit Oil quantity l 1 6 standard version 6 7 EFO version Ingress protection IP66 Size See 2 Condenser 2 70 F 400V Resistance to breakage J 3 18520...

Page 5: ...STALLATION 2 1 CONFIGURATION A flexible hose with a diameter of 100 mm should be fitted for drainage Dig the hole to a depth of approximately 1 85 m Dimensions in mm UNPROTECTED AREA IMPACT DIRECTION...

Page 6: ...instructions ENGLISH 2 2 CONSTRUCTION OF THE FOUNDATION CAGE Build the foundation cage not supplied by FAAC as shown in 4 using the 12mm and 20 mm iron rods CLASS B450C www FastGateOpeners com 800 878...

Page 7: ...lectronic board 7 Pour class C30 37 concrete around the cage to secure it properly up to about 10 cm from ground level Wait a minimum of 7 days to allow the concrete to cure properly Laythepipingneces...

Page 8: ...0 pursuant to UNI EN 12620 The bollard must only be installed once the concrete has cured for at least 7 days The compaction index of the surrounding soil should be at least 90 of the optimal Proctor...

Page 9: ...ndpassedthrough the cable guides provided on the pit sheet 8 1 and through the two corrugated conduits supplied with the pit Pass the wires through on the guides on the bollard frame as per as 8 2 the...

Page 10: ...d resting it against the coun terframe remove the two eye bolts 11 1 and fix the bollard in place using the 24 TCEI M24x50 screws supplied with the pit IMPORTANT Tighten the screws to a torque of 50Nm...

Page 11: ...rewandremovethefourTORXT30screwssecuringthecover of the hydraulic control unit in place 13 1 4 Remove the cover of the hydraulic control unit 5 Unscrewthelocknut 13 2andloosenthescrew 13 3tomove the c...

Page 12: ...pressure switch EFO solenoid valve Heater optional Refer to the diagram below EFO N O connection activtes also in case of black out EFO N C connection voluntary activation only Before performing any w...

Page 13: ...Y 7 PresstheFbuttonandholditdownwhilstsimultaneouslypressing the button to exit programming screen and save the changes made For more information on programming the equipment please refer to the relev...

Page 14: ...STOP LOOP 1 LOOP 2 LOOP 2 LOOP 1 CLOSE FSW EMERGENCY OUT 1 OUT 2 OUT 3 GND GND 24 V 24 V OUT 3 3 7 11 13 1 dF 06 LO C 3 03 Y 4 LO Cu F F F F F F F F F F 10 s F F 10 s Translation of the original instr...