background image

J275  2K  HA 

532208        -  Rev.A

Tr

ansla

tion of the original instruc

tions

ENGLISH

This manual provides the correct procedures and requirements for 
installing J275 2K HA and maintaining it in a safe condition.
When drafting the manual, the results of the risk assessment con-
ducted by FAAC S.p.A. on the entire product life cycle have been taken 
into account in order to implement effective risk reduction measures.
The following stages of the life cycle of the product have been con-
sidered:

 

-

Delivery/handling

 

-

Assembly and installation

 

-

Set-up and commissioning

 

-

Operation

 

-

Maintenance/troubleshooting

 

-

Disposal at the end of the product’s life cycle

Risks arising from installation and using the product have been taken 
into consideration; these include:

 

-

Risks for the installation/maintenance technician (technical 
personnel)

 

-

Risks for the user of the automation system

 

-

Risks to product integrity (damage)

In Europe, the automation of     a bollard   falls under the Machinery 
Directive 2006/42/EC and the corresponding harmonised standards. 
Anyone automating     a bollard (new or existing)   is classified as the 
Manufacturer of the Machine. They are therefore required by law, 
among other things, to carry out a risk analysis of the machine (    bol-
lard    in its entirety) and take protective measures to fulfil the essential 
safety requirements specified in Annex I of the Machinery Directive.
FAAC S.p.A. recommends that you always comply with standards 
EN 12453 and EN 12445 and in particular that you adopt the safety 
criteria and devices indicated in these standards, without exception, 
including the dead-man function.
 This manual also contains general information and guidelines, which 
are purely illustrative and not exhaustive, in order to facilitate the ac-
tivities carried out by the Manufacturer of the Machine in all respects 
with regard to carrying out the risk analysis and drafting the instruc-
tions for use and maintenance of the machine. It should be clearly 
understood that FAAC S.p.A. accepts no liability for the reliability and/ 
or completeness of the above instructions. As such, the manufac-
turer of the machine must carry out all the activities required by the 
Machinery Directive and the corresponding harmonised standards 
on the basis of the actual condition of the locations and structures 
where the product J275 2K HA will be installed, prior to commission-
ing the machine. These activities include the analysis of all the risks 
associated with the machine and subsequent implementation of all 
safety measures intended to fulfil the essential safety requirements.
This manual contains references to European standards.  The auto-
mation of     a bollard    must fully comply with any laws, standards and 
regulations applicable in the country where installation will take place.

 

L

Unless otherwise specified, the measurements provided in the instruc-
tions are in mm.

1.  INTRODUCTION TO THE INSTRUCTION MANUAL

1.1  MEANING OF THE SYMBOLS USED

 1 

Symbols: notes and warnings on the instructions

F

WARNING ELECTRIC SHOCK HAZARD - The operation or stage described 
must be performed following the supplied instructions and applicable 
safety regulations.

!

WARNING, PERSONAL INJURY HAZARD OR RISK OF DAMAGE TO COMPO-
NENTS - The procedure or step described must be carried out following the 
instructions provided and according to the applicable safety regulations.

L

WARNING - Details and specifications which must be respected in order to 
ensure that the system operates correctly.

RECYCLING and DISPOSAL - Components and structural materials, batteries 
and electronic components must not be disposed of together with household 
waste. They must be taken to authorised disposal and recycling centres.

For manual lifting, there should be 1 person for every 20 kg to be lifted.

PAGE E.g.: 

6

  see Page 6.

FIGURE E.g.: 

1

-3  see Figure 1 - detail 3.

TABLE E.g.: 

1

   see Table 1.

§

CHAPTER/SECTION E.g.: §1.1  see section 1.1.

APPENDIX E.g.: 

1

  see Appendix 1.

Summary of Contents for J275 2K HA

Page 1: ...J275 2K HA...

Page 2: ...s cit s sont la propri t de leurs fabricants respectifs Les clients peuvent faire des copies pour leur usage exclusif Ce manuel a t publi en 2017 Copyright FAAC S p A ab dem 2017 Alle Rechte vorbehalt...

Page 3: ...ols used 4 2 SAFETY RECOMMENDATIONS 5 2 1 Installer safety 5 3 J275 2K HA 6 3 1 Intended use 6 3 2 Limitations of use 6 3 3 Unauthorised use 6 3 4 Emergency use 6 3 5 Product identification 6 3 6 Tech...

Page 4: ...alysis and drafting the instruc tions for use and maintenance of the machine It should be clearly understoodthatFAACS p A acceptsnoliabilityforthereliabilityand or completeness of the above instructio...

Page 5: ...C The installer is responsible for the installation testing of the automa tion and for completing the Register of the system The installer must prove or declare to possess technical and profes sional...

Page 6: ...resence of flamma ble gases or fumes is a serious safety hazard the product is not 94 9 EC ATEX certified It is prohibited to power the system with energy sources other than those specified It is proh...

Page 7: ...dule with cable routing hole x1 3 Cable gland 4 Side module x7 5 Base with water drainage holes Pit 3 7 COMPONENT IDENTIFICATION 3 6 TECHNICAL CHARACTERISTICS The cylinder is moved by an internal hydr...

Page 8: ...15 C 55 C Ambient operating temperature with optional heater 25 C 55 C Type of use Intensive Bollard weight 160 kg Pit weight 60 kg Oil quantity 1 5 l Oil type FAAC HP OIL Protection rating IP56 Hydr...

Page 9: ...tres of water into the hole making sure that it drains in less than 30 minutes If it takes longer drain rainwater by installing a 60mm pipe connected to the drainage system or a pit The pitmustbefitte...

Page 10: ...200 200 6 6 22 Translation of the original instructions ENGLISH 4 3 MAKING THE CAGE The foundation cage is not supplied by FAAC and has to be made on site 1 7 Make and assemble the cage according to...

Page 11: ...the final road surface 4 10 Install a flexible sheath ID 45 mm from the cable gland to the control board 1 L The maximum distance between the bollard and the board is 50 m 5 Install the conduits requ...

Page 12: ...hroughthecable gland provided 2 4 Connect the conductors to the external junction box and the control board following the instructions in section 5 1 5 Check that the bollard operates correctly accord...

Page 13: ...ten the cover to the frame using the eight M6x10 screws L To reposition or lift the cover prise one of the two slots upwards using a screwdriver 4 6 MANUAL OPERATION Beforecarryingoutthereleaseprocedu...

Page 14: ...Replace the plugs 1 4 Lift the head in order to access the release device 5 Turn the release device anticlockwise using the key provided RESTORING AUTOMATIC OPERATION 1 21 Turn the release device clo...

Page 15: ...utomation must be fitted with a 0 03 A differential switch Install a circuit breaker and a differential switch upstream of each control board The metal parts of the structure must be earthed Check tha...

Page 16: ...bollard J275 2K HA by performing the following operation 1 Accesslevel1programmingbyholdingdowntheFbuttononthe board 26 The letters dF will appear on the display 2 Release the F button and with the b...

Page 17: ...COM COM LAMP FAN J1 J2 M4 M5 M6 1 2 3 4 5 6 J5 J3 1 2 3 1 2 3 J5 J3 4 5 6 4 5 6 1 dF 05 2 o 1 1 1 P1 no o2 12 P2 no 3 b6 Y F F F F F F 10 s 1 dF 05 LO C 2 03 Y b6 Y 3 LO Cu 4 o 3 1 5 P3 no F F F F F...

Page 18: ...reachesthehighposition and reverses immediately Make sure that the limit switches are wired correctly 25 Makesurethattheupperlimitswitchisinthe correct position 2 7 The bollard does not raise Make sur...

Page 19: ...pleting mainte nance Before starting activities wait for the components subject to heating to cool down Do not modify the original components in any way FAAC S p A disclaims any liability for damage c...

Page 20: ...heck the mechanical stops fastening and solidity 12 Makesurethatthecylinderiscleanandifnecessarytouchupthepaintwork Checkthattheautomationsystemoperatescorrectly followingtheset logic when using the v...

Page 21: ...lange together with the seal provided Insert the cable in to the cable gland 2 and connect it to connector 3 inside the junction box according to the diagram shown in the figure Pink Blue Blue Violet...

Page 22: ...istribution flange 4 Screw the solenoid valve onto the distribution flange 5 Install the control coil onto the solenoid valve 6 Remove the plug from the cable gland 41 1 insert the cable andconnectitt...

Page 23: ...of the relative control board master or slave as indicated in the following diagram Master JE275 board Slave JE275 board 7 3 COVER Use the cover to make the pit of the bollard which has not yet been...

Page 24: ...FAAC S p A Soc Unipersonale Via Calari 10 40069 Zola Predosa BOLOGNA ITALY Tel 39 051 61724 Fax 39 051 758518 www faac it www faacgroup com J275 2K HA 24 532208 Rev A...

Reviews: