
7.3
Programming Gate Movements
In this stage, your control board will memorize run time so it may judge where to begin slowing down for the
soft stop feature. Also if the auto-close feature is activated it will learn the user specified pause time.
1. Release the operator gears using the manual release process. Once released, manually move the gate
half way between the open and close position (this does not need to be exact).
2. Relock the operator gears at the half way point through its cycle. Verify your operator control
board is showing
on the LED display.
3. Press and hold down
P2
until the LED display shows the A parameter and the relevant number ap-
pear in the LED display.
4. Give an
OPEN A
command. This can be done with any opening device (keypad, push button, etc…)
wired into OPEN A and COM
or
by using the transmitter. You can also briefly (one second or less)
jump OPEN A and COM with a wire. This will begin your gate in the
CLOSING DIRECTION
and the LED display will read “Pr”.
5.
When the closing limit switch is reached, the motor pauses for approximately 2 seconds, and then re-
starts with a total opening maneuver to the opening stop limit switch.
6. When the full open stop or limit switch is reached the gate will stop.
7. Wait for the amount of time you would like your gate to pause for during normal operation before
automatically re-closing and then signal your opener using an OPEN A contact or transmitter signal to
close the gate. The gate will then return to closed and programming will be complete.
(Even if your auto close is off you must still set a pause time, the pause time will not
be used in normal gate operation.)
IMPORTANT:
If the gate begin to open rather than close, the gate must be stopped with a
reset pulse. You can either:
Touch the TWO pins of the JMP “RESET” using a screwdriver
OR
Disconnect all power (transformer and backup battery)
Then switch the wires leading into APM1 and CHM1. Also switch the wires between FCC and
FCA.
Summary of Contents for Estate Slide
Page 1: ...Instruction Manual for the Manufactured by E SL 1800 Series ...
Page 15: ......