E045S
10
532373 - Rev.A
Tr
ansla
tion of the orig
inal instruc
tions
ENGLISH
LED status
Gate status
On
Opening, Open, Pause
Off
Closed
Flashing
Closing
Alternatively, the output can be programmed to
indicate the automation closed status (programming
function
Sp
).
Do not exceed the maximum load of 100 mA.
ELECTRIC LOCK
J11
J9
J9
J11
F
+
/R1
-
/R2
RADIO
2EASY
CONNECTIVITY
USB-A
MAIN
PE
N
L
230 V~
9 10 11
20 21
LAMP
M1
M2
M
M
1
PE N L
2 3 4 5 6 7 8
CO
M
OP
CL CO
M
OP CL
C
C
230 V
~
60 W max
24 V
"
3 W max
115V
-F10A
230V
-F5A
T0.8A
15 16 17 18
O
P-
A
OP
-B
ST
OP
+24V
+24V
W
.L.
LOCK
The E045S can control an electric lock mounted on the
leaf activated by motor 1 in order to lock the gate in
the closed position.
If the Bus 2easy encoder is installed and enabled, the
electric lock is activated only just before the leaf opens
from the closed position.
If the Bus 2easy is not enabled, the electric lock is ac-
tivated before each opening movement, irrespective
of the position of the leaf.
Use an FAAC 12 V~/24 V
"
electric lock or a generic 24
V
"
/0.5 A electric lock with a maximum current of 3 A.
XF RADIO MODULE
J5
The quick insertion connector J5 is specifically for FAAC
model XF radio modules.
Insert as shown in the figure.
To memorize radio control codes see § Accessories.
FLASHING LIGHT
J2
F
+
/R1
-
/R2
RADIO
2EASY
CONNECTIVITY
USB-A
MAIN
PE
N
L
230 V~
9 10 11
20 21
LAMP
M1
M2
M
M
1
PE N L
2 3 4 5 6 7 8
CO
M
OP
CL CO
M
OP CL
C
C
230 V
~
60 W max
24 V
"
3 W max
115V
-F10A
230V
-F5A
T0.8A
15 16 17 18
O
P-
A
OP
-B
ST
OP
+24V
+24V
W
.L.
LOCK
The flashing light indicates that the gate is moving
and must be installed in a position that is visible from
both sides of the gate.
The flashing light must be a 230 V~, max 60 W model.
Pre-flashing of 3 s before movement can be enabled
via programming function
PF
.
MOTORS
F
+
/R1
-
/R2
RADIO
2EASY
CONNECTIVITY
USB-A
MAIN
PE
N
L
230 V~
9 10 11
20 21
LAMP
M1
M2
M
M
1
PE N L
2 3 4 5 6 7 8
CO
M
OP
CL CO
M
OP CL
C
C
230 V
~
60 W max
24 V
"
3 W max
115V
-F10A
230V
-F5A
T0.8A
15 16 17 18
O
P-
A
OP
-B
ST
OP
+24V
+24V
W
.L.
LOCK
J2
COM
Motor COMMON contact
OP
PHASE to open the electric motor
CL
PHASE to close the electric motor
C
Thrust capacitor
For single operator installations, connect the motor
to terminals M1.
For double operator installations, connect:
-
the motor that opens first to terminals M1
-
the motor that closes first to terminals M2
!
The operators MUST be connected to the earth of the
electrical system.