background image

a

a

c

b

c

306

225

Fig. B

Fig. F

Fig. C

Fig. D

Fig. E

 230v -> 2,5A - 250v

 115v -> 4A - 120v

Fig. A

130

64

 0 

BOX LAYOUT

Fig. B shows the four 5 mm diam. holes for securing the box 
(ref.

a

) to the wall, the three fittings M16/M20/M25 for installing 

the cable grippers (ref.

b

) and the two lid hinges (ref.

c

).

  THE  bOX  CONTAINS  THE  E024S  ELECTRONIC  uNIT  AND 

THE DEvICES TO pOWER IT. IT MuST THEREFORE bE HAN-

DLED WITH CARE DuRING ALL INSTALLATION STAGES, TO 

AvOID DAMAGING ITS COMpONENTS.

The dimensions of the box are shown in Fig.A:

The lid hinges can be moved upward to allow opening the box 
housing (Fig. C); they can also be removed and re-positioned 
in order to enable the lid to open to the right or left.

When you have secured the box in the selected position, cover 
the securing holes (ref.

Fig.B) and the screws with the supplied 

plugs as shown in Fig.D.

After you have finished the operations to connect the control 
board with the various parts of the automated system, close 
the box, positioning the lid in its seat with seal.
Connect the supply as shown in Fig. E.

Dimensions in mm

ELECTRICAL bOX E024S

Next, tighten the four supplied screws to guarantee the degree 
of protection against external agents (Fig.F).

ENGLISH

2

Summary of Contents for E024S

Page 1: ...E024S...

Page 2: ...underwent a test in a typical uniform configuration all products made by FAAC S p A Bologna 01 03 2009 The Managing Director A Marcellan INDEX 0 BOX LAYOUT 2 1 WARNINGS 3 2 LAYOUT AND CONNECTIONS 3 3...

Page 3: ...n Fig A The lid hinges can be moved upward to allow opening the box housing Fig C they can also be removed and re positioned in order to enable the lid to open to the right or left When you have secur...

Page 4: ...ing threshold Always separate power cables from control and safety cables push button receiver photocells etc To avoid any electrical disturbance use separate sheaths or a screened cable with the scre...

Page 5: ...2 GND Negative 3 STOP Device with NC contact which causes the automated system to shut down 4 OPEN B Device with N O contact see chap FUNCTION LOGICS 5 OPEN A J10 RED terminal BUS Safety devices with...

Page 6: ...en impulse is detected Then the procedure described in paragraph 6 3 1 or paragraph 6 3 2 starts At the end of a successful SETUP procedure the LEDs switch off Otherwise the procedure ends with the re...

Page 7: ...E LOGIC Repeatedly press the SW3 push button to select one of the 7 programming logics available The selected logic is signaled by the LD7 LED The number of blinkings corresponds to the number of the...

Page 8: ...CLOSING ON OFF OFF ON ON OFF ON OFF ON OFF ON ON ON ON OFF OFF ON ON OFF ON ON ON ON OFF OFF ON OFF OFF A OPENING and CLOSING OFF ON OFF ON ON ON ON ON OPEN PULSE Tab 3 Addressing of BUS Photocells T...

Page 9: ...EN A or partial opening OPEN B and as you hold it down also press the SETUP SW1 push button The relevant LED starts to flash slowly for 5 sec Release both push buttons Within these 5 sec while the rad...

Page 10: ...e controls only with receiver module at 433 MHz Press the LOGIC SW3 or SPEED SW2 push button to memory store respectively total opening OPEN A or partial opening OPEN B and as you hold it down also pr...

Page 11: ...tion to the indications of the status LEDs on the body of each encoder Fig 1 Below we list the functions of LEDs LD1 DL2 and DL3 and their statuses TAB 1 Encoder connection and LED status LED LIGHTED...

Page 12: ...release OPEN stops saves CLOSE OPEN rerecloses leaves immediately 1 rerecloses leaves immediately no effect OPEN CLOSE disabled no effect no effect CLOSE disabled no effect OPEN CLOSE disabled CLOSING...

Page 13: ...d opens at release saves CLOSE OPEN IN PAUSE restores pause time 1 restores pause time 1 stops operation no effect locks and closes on disengage ment after 5 s recharges pause time CLOSE disabled CLOS...

Page 14: ...rliegendem Handbuch sind unverbindlich FAAC beh lt sich das Recht vor ohne die wesentlichen Eigenschaften dieses Ger tes zu ver ndern und ohne Verbindlichkeiten in Bezug auf die Neufassung der vorlieg...

Reviews: