![FAAC A1400 AIR RD Manual Download Page 27](http://html1.mh-extra.com/html/faac/a1400-air-rd/a1400-air-rd_manual_535444027.webp)
A1400 AIR RDT
27
532119 04 - Rev. C
22
21
23
3
3
3
2
4
1
5
5
3
4
2
1
Tr
ansla
tion of the original instruc
tions
ENGLISH
8. Check verticality with a spirit level.
9. Adjust the distance between leaf profile and balancing profile with
the grub screws on the profile
21
-
. This adjustment corrects
any flaws on the wall surface.
10. Check proper vertical and horizontal alignment.
11. Fasten the fixed leaf sides as in
21
-
.
!
Should it be necessary to cut the balancing profile, attention must
be paid to the alignment of holes, which have variable pitch. It is
recommended to mark the references for the cut starting from the top.
FASTENING THE FIXED LEAVES
Fixed leaves may be:
-
with low skirting
-
with high skirting
Fasten the fixed leaf to the floor and plug the leaf
22
-
with
suitable screws and dowels.
-
Use adequate wall bits and dowels with screws.
!
Ensure there are no hydraulic coils or electrical conduits under the
floor at the planned drill points.
MOUNTING MOBILE LEAVES
Mount the leaves as described § 9
32
.
GLAZING INSTALLATION
1. Place the 3 shims in the lower part of the profile
22
-
.
2. Place the glazing on the shims.
23
-
.
!
Handle the glazing adhering to the safety warnings in the Safety
chapter.
3. Secure the glass with the blocks supplied
23
-
.
4. Insert the beading along the entire length of the perimeter.
!
The beading must be inserted with the spline side towards the inside
of the profile
23
-
.
ASSEMBLY OF THE HEAD SECTION TO THE UPPER
PROFILE
Mount the assembled head section onto the upper profile by means
of suitable attachments.
After mounting the head section, perform all procedures to secure the
leaf to the carriages as set out in the chapters concerning kit assembly.
Refer to chapter § 8 also for all adjustment procedures.
7.2 ENTRY DOOR WITH PROFILES TK20
PRELIMINARY OPERATIONS
1. Check soundness of the installation opening (Masonry, Structural
Metal Work, etc.).
2. Take the measurements of the opening.
!
The frame must be fastened to the structure with suitable attach-
ments.
Ensure there are no hydraulic coils or electrical conduits under the
floor at the planned drill points.
3. Measure the door frame and compare them with the opening
measurements.
4. Check floor levelness with a spirit level.
Summary of Contents for A1400 AIR RD
Page 1: ...A1400 AIR RDT EN16005 2012...
Page 112: ...A1400 AIR RDT 112 53211904 Rev C...
Page 116: ...A1400 AIR RDT 116 53211904 Rev C...
Page 117: ...Translation of the original instructions ENGLISH...