
12
13
844 ER 3PH
14
532366 - Rev.A
~ 15 cm
19
70
Z16/Z20
Z12
Tr
ansla
tion of the orig
inal instruc
tions
ENGLISH
5.2 INSTALLING THE FOUNDATION PLATE
RISKS
PERSONAL PROTECTIVE EQUIPMENT
F
Carry out the work with the power supply disconnected.
!
- The 844 ER 3PH must be installed with the foundation plate.
- The installer is responsible for the evaluation of the foundation materials
and dimensions on the basis of the characteristics of the ground and place of
installation. Perform structural calculations where necessary.
1. Assemble the foundation plate.
2. Make the hole in the ground. Fill it with concrete, making sure that
the cable conduits protrude in the correct position with respect
to the gearmotor. Place the plate at the centre of the foundation,
leaving its surface uncovered.
3. Clean any concrete from the surface of the plate and the nuts with
washers so that they can be subsequently adjusted. Check the
plate is horizontal using a spirit level.
4. Wait for the concrete to set.
5.3 INSTALLING THE PINION
1. Insert the pin into the drive shaft.
L
Use the dowel pin provided to install the Z16/Z20 pinion. Use the split pin
included in the package for the Z12 pinion.
2. Insert the pinion and secure it using the washer provided.
mechanical release side
pinion side
Install the Z16/Z20 pinion
Install the Z12 pinion
Assemble the foundation plate
Place the foundation plate
Summary of Contents for 844 ER 3PH
Page 1: ...844 ER 3PH Translation of the original instructions...
Page 29: ......
Page 30: ......
Page 31: ......