background image

9

ENGLISH

ENGLISH

Fig. 9

- ascertain the correct location of the leaf on the “U”

profile with reference to the axis of rotation (fig. 10 a-b);
seal the “U” profile on the post side with a plate, as
shown in fig. 10 a-b.

3)

Carefully weld the guide bracket to the support bracket
(fig. 11).

Fig. 10 a

Fig. 11

Fig. 12

110

°max

110

°max

Note

: grease the operator pinion and the fixing pivots of the

two levers.

4)

Install the second operator, if required, repeating the
operations described above.

5)

Install the electronic control unit, referring to the
dimensions indicated in the relevant instructions.

6)

Fasten the box cover by means of the screws supplied
(fig. 14).

4. START-UP

1)

Programme the electronic control unit according to
your requirements, following the relevant instructions.

2)

Connect the system to the power supply, and check
the status of the LEDs, referring to the table contained
in the instructions relevant to the electronic control unit.

5. TESTING THE AUTOMATION SYSTEM

Carefully test the operation of the automation system and
of all connected accessories.

Give the customer the User’s Guide page, and show him
the correct operation and use of the automation system.

Fig. 10 b

4)

Fit the gate into the guide bracket and fix the top hinge
in place.

IMPORTANT

: To ensure trouble-free operation, do NOT weld

the gate leaf to the guide bracket or to the support bracket.

5)

Manually verify whether the gate opens and closes
completely and smoothly, stopping at the mechanical
travel stops.

3.4

INSTALLING THE OPERATOR

1)

Open the gate leaf.

2)

Place the operator on the fastening screws on the
foundation box, and fix it by means of the nuts and
washers supplied (fig. 13).

Note

: the exact position of the operator is shown in 

figure 12.

In any case the operator pinion must be on the opposite
side of leaves opening direction.

3)

Manually close the leaf and fit the driving levers supplied,
as shown in fig. 13.

Reviews: