Index
A
AC-powered equipment guidelines 21
C
cables
connecting 16
CD/DVD-ROM drives
support for 9
chassis ground
location of 8
D
DC-powered equipment
guidelines 22
E
electrostatic discharge (ESD) 12, 20
ESD, See electrostatic discharge (ESD).
Ethernet hub requirements 9
F
failover cable 16
front mount
kit hardware 13
front-mounting kit
installing 13
G
Gigabit Ethernet 9
H
hardware
for AC-powered equipment 21
for DC-powered equipment 22
hardware installation
planning 12
hardware requirements
for peripherals 9
I
indicator LEDs
locating 8
M
management interface 16
management IP address
configuring using LCD panel 17
N
NEBS
air temperature 20
P
pass-through adapter, See RJ45F to RJ45M rolled serial adapter.
platform
about 8
installing 11
repackaging 24
unpacking 12
ventilation 20
platform components 8
power cable 16
Q
qkview utility 16
quick-install rail kit 14
R
rack mount
front mount 13
general environmental guidelines 20
quick-install rail kit 14
types of kits 13
unit spacing 12
rack-mounting ears 13
rack-mounting screws 13
rack rail, See rail mount.
rail lock brackets
installing 15
rail locks 15
rail mount
installing rail lock brackets 15
quick-install rail kit 14
redundant system configuration 16
remote administration 9
repackaging
RJ45F to RJ45M rolled serial adapter 16
RMA 23
27
Index
Summary of Contents for 2000 Series
Page 1: ...Setting Up the 2000 4000 Series Platform MAN 0400 01 ...
Page 2: ......
Page 4: ...4 Table of Contents ...
Page 10: ...10 About the 2000 4000 Series Platform ...
Page 18: ...18 Platform Installation ...
Page 25: ...7 Close and seal the shipping box 25 Setting Up the 2000 4000 Series Platform ...
Page 26: ...26 Repackaging Guidelines ...