Repackaging the platform
The 2000/4000 Series platform must be shipped in packaging provided by F5 Networks.
1. Disconnect the network cables and other cables from the platform, and then remove any optical modules.
2. Remove the platform from the rack.
3. Place the platform in the plastic bag, if available.
4. Place the foam inserts on the front and back sides of the platform.
5. Place the platform into the shipping box.
6. Place the accessory boxes in the foam inserts.
24
Repackaging Guidelines
Summary of Contents for 2000 Series
Page 1: ...Setting Up the 2000 4000 Series Platform MAN 0400 01 ...
Page 2: ......
Page 4: ...4 Table of Contents ...
Page 10: ...10 About the 2000 4000 Series Platform ...
Page 18: ...18 Platform Installation ...
Page 25: ...7 Close and seal the shipping box 25 Setting Up the 2000 4000 Series Platform ...
Page 26: ...26 Repackaging Guidelines ...