Summit Switch Hardware Installation Guide
2-7
Powering On the Switch
Figure 2-4 shows the pin-outs for a 9-pin to 9-pin PC-AT null-modem serial cable.
Figure 2-4:
PC-AT serial null-modem cable pin-outs
Powering On the Switch
To turn on power to the switch, connect the AC power cable to the switch and then to
the wall outlet. For the Summit4, Summit24, and Summit48 switches, turn the on/off
switch to the on position.
Note: The Summit1i, Summit5i, Summit7i, and Summit48i switches do not have
on/off switches.
Checking the Installation
After turning on power to the Summit switch, the device performs a Power On Self-Test
(POST).
During the POST, all ports are temporarily disabled, the packet LED is off, the power
LED is on, and the MGMT LED flashes. The MGMT LED flashes until the switch
successfully passes the POST.
If the switch passes the POST, the MGMT LED blinks at a slow rate (1 blink per
second). If the switch fails the POST, the MGMT LED shows a solid yellow light.
Note: For more information on the LEDs, refer to Chapter 1.
Screen
DTR
TxD
RxD
CTS
Ground
DSR
RTS
DCD
Cable connector: 9-pin female
Summit
Cable connector: 9-pin female
PC-AT Serial Port
Screen
DCD
RxD
TxD
DTR
Ground
DSR
RTS
CTS
Shell
4
3
2
8
5
6
7
1
Shell
1
2
3
4
5
6
7
8
ser_sum2
Summary of Contents for Summit Summit1i
Page 6: ...vi Summit Switch Hardware Installation Guide...
Page 8: ...viii Summit Switch Hardware Installation Guide...
Page 10: ...x Summit Switch Hardware Installation Guide...
Page 14: ...xiv Summit Switch Hardware Installation Guide Preface...
Page 52: ...2 10 Summit Switch Hardware Installation Guide Installation and Setup...
Page 62: ...B 6 Summit Switch Hardware Installation Guide Technical Specifications...