background image

b. Pull the blue release latches on the chassis rails towards the front and slide the switch

into the frame.

Note:

After you install the switch in a rack, slide it out until the lock (shown above) engages.

To slide the switch back into the rack, push the blue locks on the chassis rails towards
the back and slide the switch into the frame.

12. Connect power and network connections to the switch.

Installing the switch in an equipment rack

March 2020

Installing the VSP 7200 Series

69

Summary of Contents for EC720001F-E6

Page 1: ...Installing the Virtual Services Platform 7200 Series 9035364 Rev 03 March 2020...

Page 2: ...rks and the Extreme Networks logo are trademarks or registered trademarks of Extreme Networks Inc in the United States and or other countries All other names including any product names mentioned in t...

Page 3: ...ng a DC power supply 29 Removing a power supply 33 Install a Fan Module 34 LED state definitions 37 Switch LEDs 37 100 Mbps 1 Gbps 10 Gbps RJ 45 port LED state indicators 38 SFP and SFP port LED state...

Page 4: ...e conventions used in this guide Text Conventions The following tables list text conventions that can be used throughout this document Table 1 Notice Icons Icon Alerts you to Important A situation tha...

Page 5: ...ts indicate optional elements in syntax descriptions Do not type the brackets when you enter the command For example if the command syntax is show clock detail you can enter either show clock or show...

Page 6: ...me Networks product information at the following locations Current Product Documentation Release Notes Hardware software compatibility matrices for Campus and Edge products Supported transceivers and...

Page 7: ...for example if you have returned the device before or if this is a recurring problem Any related RMA Return Material Authorization numbers Subscribe to Service Notifications You can subscribe to email...

Page 8: ...k form Access the feedback form at https www extremenetworks com documentation feedback Email us at documentation extremenetworks com Provide the publication title part number and as much detail as po...

Page 9: ...lowing section details what is new in this document Temperature Sensors Warning and critical threshold values are updated in the document For more information see Install a Fan Module on page 34 March...

Page 10: ...cord types and order codes on page 14 Table 3 VSP 7200 Series Hardware VSP 7200 Series Description Part numbers VSP 7200 Series AC models VSP 7254XSQ fiber switch Model EC7200x1B E6 ships with back t...

Page 11: ...to 48 out of the 48 100 Mbps 1 GbE 10 GbE RJ 45 ports require a port license to be operational 2 ports Slot 2 ports 5 and 6 out of the six 40 GbE QSFP ports require a port license to be operational EC...

Page 12: ...SU For full power redundancy you can install a second 800 W DC PSU EC8005001 E6 front to back Note A back to front DC power supply is not supported Redundant fan modules Important Make sure the air fl...

Page 13: ...nsceivers see Extreme Networks Pluggable Transceivers Installation Guide VSP 7200 Series Operational Notes The VSP 7254XSQ has a PHYless design which is typical for Data Center top of rack switches Th...

Page 14: ...have auto negotiation enabled If not the link will not be established When a port on VSP 7254XSQ is disabled or enabled or a cable replaced or the switch rebooted the remote link can flap twice Enabl...

Page 15: ...16 Italy AA0020066E6 Power cord 2 5 m IEC C13 to GB 2099 1 1996 China AA0020067E6 Power cord 2 5 m IEC C13 to BS 546 SANS164 1 India South Africa AA0020068E6 Power cord 2 5 m IEC C13 to AS 3112 Austr...

Page 16: ...age 26 or DC power supply specifications on page 32 To order redundant PSUs see Hardware Models for VSP 7200 Series on page 10 for part numbers 3 Verify that the fan module air flow is going in the sa...

Page 17: ...k Ensure that there is enough rack space to accommodate a 1RU switch 4 45 cm Ensure that the rack is bolted to the floor and braced if necessary Ensure that the rack is grounded to the same grounding...

Page 18: ...rack Using the optional slide rack mount kit on page 41 Using the supplied brackets on page 71 2 Install the primary or redundant power supply Important A combination of AC input and DC input power su...

Page 19: ...the top port the down arrow on the right indicates the bottom port For a description of what the LEDs mean see 100 Mbps 1 Gbps 10 Gbps RJ 45 port LED state indicators on page 38 or SFP and SFP port LE...

Page 20: ...nic components ESD damage occurs and can result in complete or intermittent failures While networking equipment is commonly designed and tested to withstand common mode ESD events voltage can sometime...

Page 21: ...aid To install the ESD discharge cable perform this procedure 1 Connect the ground lug on the ESD discharge cable to a safe and suitable earth ground 2 Connect all RJ 45 cable connectors to the femal...

Page 22: ...ng for the VSP 7254XTQ 267 126 hours 30 5 years Table 7 Environmental specifications Operating Temperature 0 C to 50 C 32 F to 122 F Storage Temperature 40 C to 85 C 40 F to 185 F Operating Humidity 0...

Page 23: ...back or back to front One power supply ships with the unit 4 Three field replaceable fan modules either front to back or back to front 5 Documentation Note A 300mm 900mm slide rack mounting kit is ava...

Page 24: ...B E6 460W AC POWER SUPPLY BACK2FRONT COOLING NO PC EC7205A1F E6 460W AC POWER SUPPLY FRONT2BACK COOLING NO PC Refer to the following part numbers to ensure that you install the correct power supplies...

Page 25: ...t be covered to ensure proper ventilation If a power supply fails replace it as soon as you can but leave it in place until you do Leaving a power supply slot unpopulated impairs the ability of the fa...

Page 26: ...lay during boot time Always connect the AC power cord in a location that is quickly and safely accessible in case of an emergency 5 Check the LED on the bottom right side of the power supply Solid gre...

Page 27: ...88 5 8 A maximum at low input voltage 2 9 A maximum at high input voltage Input Voltage rms 100 127 V or 200 240 V 47 63 Hz 50 60 Hz nominal Power Consumption 460 W maximum Thermal Rating 1570 BTU Hr...

Page 28: ...R marking on the outside of the cord jacket to comply with the CENELEC Harmonized Document HD 21 220 or 230VAC 50 Hz Single phase United States of America Canada and Japan NEMA5 15P male plug UL recog...

Page 29: ...y slots PSU1 on the left side and PSU2 on the right If you only have one power supply you can install it in either PSU1 or PSU2 If you install a second power supply neither one acts as a primary power...

Page 30: ...ou insert a power supply upside down it will not fully insert The VSP 7200 Series does not have a power switch When you connect the DC power source to the DC power supply wiring assembly and then plug...

Page 31: ...inputs are connected to the correct connectors and that the switch is properly grounded before connecting it to a power source c Use a screwdriver to terminate the cables to the DC power supply wirin...

Page 32: ...more warning events such as high temp high power high current or a slow fan Note You can hot swap power supplies while the switch is operational One power supply is required for continued switch opera...

Page 33: ...output rise time from 10 to 90 percent must be the maximum of 70 ms and monotonic under all defined input and output conditions Efficiency 88 minimum at 100 load level 92 minimum at 50 load level 88 m...

Page 34: ...aintain the proper temperature If any sensor exceeds its threshold an alarm is triggered and the log is generated in the format Temperature Sensor CPU MAC1 MAC2 is value C has exceeded the alarm thres...

Page 35: ...emaining fans to cool the chassis Procedure 1 Check the Fan LED on the front of the chassis Solid green indicates that all fan modules are operating normally Blinking amber indicates that a fan module...

Page 36: ...n IDs 3 and 4 and the fan module on the far right has Fan IDs 5 and 6 VSP 7254XSQ 1 show sys info fan Fan Info Description OperStatus OperSpeed AirflowDir Tray 1 Fan 1 up mediumSpeed front back Tray 1...

Page 37: ...wer supply Table 15 Switch LED state indicators Label Color and Status Description PWR Off The switch is not receiving power and not operating Green steady The switch is receiving power from either on...

Page 38: ...de Green steady The port has a link in 1 Gbps mode Green blinking The port has a link and data activity in 1 Gbps mode Green slow blinking The port is administratively disabled Blue steady The port ha...

Page 39: ...he port is used Table 18 SFP SFP port LED state indicators Label Color and Status Description Link Act Off There is no transceiver present and the port is administratively enabled Amber steady The por...

Page 40: ...blinking rates on the switch For more information about the LEDs and a description of the blinking rates see the preceding LED sections Installing the switch in an equipment rack There are two ways t...

Page 41: ...11002 Note The illustrations show the VSP 7200 Series as an example but the instructions apply to any switch in the VSP 7200 Series and VSP 8000 Series For instructions see Inventory of slide componen...

Page 42: ...actually consists of two separate rails that slide into each other Rack rail This rail is the main component that connects to the equipment rack Chassis rail This rail is embedded in the rack rail Lat...

Page 43: ...erent brackets Short rear bracket The slide rail kit comes with this bracket installed for the 300mm 600mm default configuration Figure 8 Short rear bracket Installing the switch in an equipment rack...

Page 44: ...hows the extension bracket and the long rear bracket Both are used for a 600mm 900mm configuration Figure 9 Extension and long rear brackets Locks and latches This section describes the locks and latc...

Page 45: ...crew lock This feature is on the front end of the chassis rails and is used to lock the switch in the home position of the equipment rack Figure 11 Thumbscrew lock Installing the switch in an equipmen...

Page 46: ...he white release latches to remove a switch from an equipment rack if necessary Figure 12 White release latch Blue release latch This latch is a blue plastic tab that is also on the chassis rail Use t...

Page 47: ...the switch in a rack and then pull the switch out this mechanism automatically locks the slide rail in a fully extended position Retaining latch These latches are on the front and back of the slide r...

Page 48: ...to the holes in the rack For racks with large round holes the pin block retracts halfway when you insert the rail into the rack For racks with small round holes the pin block retracts all the way when...

Page 49: ...and features Procedure 1 Disconnect the power cord from the switch 2 Open the shipping carton and remove the bag of screws and the two slides used in 300mm 600mm racks Note The 300mm 600mm slides are...

Page 50: ...b Pull the inner chassis rail and slide it out as far as you can Installing the Virtual Services Platform 7200 Series March 2020 Installing the VSP 7200 Series 50...

Page 51: ...stamped on the lock and pull the chassis rail out of the rack rail 4 Lift the blue locking mechanism on the rack rail to slide the outer section back into the main section Installing the switch in an...

Page 52: ...mbscrew lock towards the front and position the rail over the standoffs on the chassis b Slide the chassis rail to the rear until the rail locks into the standoffs c Make sure the safety tab locks int...

Page 53: ...ining latch is facing front b Adjust the length of the rack rail so it fits the rack depth by loosening the two screws on the rack rail and adjusting the length Make sure the screws are tight before y...

Page 54: ...commodates three different rack types In the default position the pin block fits into racks with square holes When retracted halfway it fits into racks with large round holes When fully retracted it f...

Page 55: ...Repeat these steps for the rack rail on the other side of the frame 7 Use the following steps to install the switch in the equipment rack to complete the installation a Insert the chassis rails on th...

Page 56: ...slide it out until the lock shown above engages To slide the switch back into the rack push the blue release latches on the chassis rails towards the back and slide the switch into the frame 8 Connect...

Page 57: ...e 41 section to familiarize yourself with the slide components and features Procedure 1 Disconnect the power cord from the switch 2 Open the shipping carton The 300mm 600mm slides are the default conf...

Page 58: ...b Pull the inner chassis rail and slide it out as far as you can Installing the Virtual Services Platform 7200 Series March 2020 Installing the VSP 7200 Series 58...

Page 59: ...stamped on the lock and pull the chassis rail out of the rack rail 4 Lift the blue locking mechanism on the rack rail to slide the outer section back into the main section Installing the switch in an...

Page 60: ...mbscrew lock towards the front and position the rail over the standoffs on the chassis b Slide the chassis rail to the rear until the rail locks into the standoffs c Make sure the safety tab locks int...

Page 61: ...t rear bracket to the rack rail This bracket is for 300mm 600mm equipment racks only and is not used in this installation Save the bracket for possible future use Installing the switch in an equipment...

Page 62: ...the extension bracket and the long rear bracket Use these brackets to extend the rack rail for 600mm 900mm racks Installing the Virtual Services Platform 7200 Series March 2020 Installing the VSP 7200...

Page 63: ...r as possible b Note the order and position of how the components are installed The extension bracket with the flat side down goes on top of the rack rail and then the long rear bracket slides into th...

Page 64: ...the rack rail by inserting the screws from the rack rail side and then into the extension bracket The following figure shows the extension bracket attached to the rack rail Installing the Virtual Serv...

Page 65: ...s on the end of the long rear bracket f Lift the blue locking mechanism and slowly slide the rail back into the main assembly This exposes a window over the screw holes so you can install the remainin...

Page 66: ...rail so that the end with the black retaining latch is in the front of the rack b Adjust the length of the rack rail so it fits the rack depth by sliding the long rear bracket into the extension brac...

Page 67: ...ck accommodates three different rack types In the default position the pin block fits into racks with square holes When retracted halfway it fits into racks with large round holes When fully retracted...

Page 68: ...at these steps for the rack rail on the other side of the frame 11 Use the following steps to install the switch in the equipment rack to complete the installation a Insert the chassis rails on the sw...

Page 69: ...tch in a rack slide it out until the lock shown above engages To slide the switch back into the rack push the blue locks on the chassis rails towards the back and slide the switch into the frame 12 Co...

Page 70: ...uipment rack Removing the switch from an equipment rack Follow these steps if you have to remove the switch from an equipment rack Important This procedure requires two people Procedure 1 Disconnect t...

Page 71: ...assis upon the tray The brackets secure the chassis and prevent it from sliding off the tray during vibration or when inserting or extracting transceivers Caution Do not mount the chassis in a rack wi...

Page 72: ...lide the switch onto a shelf or tray in the rack 4 Insert and tighten the rack mount screws 5 Verify that the switch is securely fastened to the rack 6 Connect power and network connections to the swi...

Page 73: ...the transceiver for specifications Installation and removal of transceivers The following sections describe how to install and remove transceivers in the VSP 7200 Series switch In this context the te...

Page 74: ...cover over the fiber optic bores and store the transceiver in a safe place until you need it Note Discard transceivers in accordance with the proper laws and regulations Console port pin assignments...

Page 75: ...f the hardware as noted below For the VSP 7200 Series MACsec is supported on the 10G SFP ports of the VSP 7254XTQ model only VSP 7254XSQ does not support MACsec Viewing hardware information About this...

Page 76: ...Supply Info Ps 1 Status empty Ps 2 Status UP Ps 2 Type AC Ps 2 Description DPS 800RB Q Ps 2 Serial Number HHTD1450000120 Ps 2 Version S0F Ps 2 Part Number 700510692 Total Power Available 800 watts Fa...

Page 77: ...26 2017 13 51 26 bld 17042617 Variable definitions Use the data in the following table to use the show sys info command Variable Value card Displays information about the device Includes type serial...

Page 78: ...dans une baie ne l empilez pas directement sur un autre Chaque module doit tre fix sa propre baie l aide des supports de montage appropri s Ces supports ne sont pas con us pour r sister plusieurs modu...

Page 79: ...nstallez pas le module dans une baie veillez laisser la plaque m tallique sur la baie Si vous la retirez l a ration du module ne peut pas s effectuer correctement Caution Precaution Si no instala ning...

Page 80: ...alimentation En outre vous devez d gager un espace minimal dans la zone de c blage pour pouvoir y acc der facilement en cas d urgence Warning Warning Advertencia Para apagar el dispositivo debe desenc...

Page 81: ...taci n con toma de tierra De lo contrario al tocar el interruptor puede recibir una descarga el ctrica Si no hay un circuito de toma de tierra en el enchufe puede producirse un exceso de emisiones Dan...

Reviews: