Chapter 5: Installing the VSP 4000 4850GTS
Series
Installation checklist
Use this checklist to install the VSP 4850GTS series.
No.
Task
Description
1.
Install the VSP 4850GTS series.
You can install the switch in two ways:
•
Installing the Virtual Services Platform 4000
on a table or shelf
on page 23
•
Installing the Virtual Services Platform 4000
in an equipment rack
2.
Install the primary or redundant
power supply.
Important:
Extreme Networksdoes not
support a combination of AC-
input and DC-input power
supplies in the same chassis.
For the procedure to install the power supply,
see
Installing the Virtual Services Platform
4.
Check the LEDs to verify the
installation.
For a description of the LEDs, see
on page 36.
Installation fundamentals
The following section describes the installation fundamentals for the VSP 4850GTS series.
The VSP 4850GTS series consists of the following models:
• VSP 4850GTS
• VSP 4850GTS DC
• VSP 4850GTS-PWR+
August 2018
Installing Virtual Services Platform 4850GTS Series
16