![Extreme Networks Altitude 3510 Installation Manual Download Page 21](http://html1.mh-extra.com/html/extreme-networks/altitude-3510/altitude-3510_installation-manual_2454765021.webp)
Altitude 3510 Access Point Installation Guide
21
6
Use a drill to make a hole in the tile the approximate size of the AP3510 LED light
pipe.
CAUTION
Extreme Networks recommends care be taken not to damage the finished surface of the ceiling
tile when creating the light pipe hole and installing the light pipe.
7
Remove the light pipe’s rubber stopper (from the AP3510) before installing the light
pipe.
8
Connect the light pipe to the bottom of the AP3510. Align the tabs and rotate
approximately 90 degrees. Do not over tighten.
.
9
Snap the clips on the light pipe into the bottom of the AP3510.
10
Fit the light pipe into hole in the tile from its unfinished side.
11
Place the decal on the back of the badge and slide the badge onto the light pipe from
the finished side of the tile.
12
Attach the Radio 1 and Radio 2 antennas to their correct connectors.
13
For information on the antennas available to the AP3510, see “
AP3510 Antenna
Options
” on page 12.
CAUTION
Ensure you are placing the antennas on the correct connectors to ensure the successful
operation of the AP3510.
Light Pipe
Decal
Badge
Ceiling Tile