www.extrememarquees.com.au 1300 850 832
4. Assembly Cautions
a) Before commencing construction refer to the Ground Set Out
plan of the marquee. Measure the ground area and confirm the
marquee dimensions.
b) Fix the Base Plate of the Marquee after assembling the
complete frame.
c) For safety reasons it is recommended that four persons
setup any Crest Marquee. Read the instruction manual carefully
and check all parts before construction.
d) Check the wind and weather conditions before
commencing construction.
e) Ensure the area is free from any sharp objects and
overhead objects.
f) Ensure you have the correct ground fixings for your application.
1. Grass: Steel Stakes
Fix each Base Plate with Steel Stakes. Ensure stakes are
appropriately secured into the soft surface (Grass/Dirt).
2. Concrete: Dynabolt
Fix each Base Plate with Dynabolts.
3. Weight Plate: Ground Mounting (suitable for any surface)
Each Base Plate will need to have at least 200kg.
g) Once constructed a safety inspection should be
conducted on a regular basis.
4.1 Dismantle Cautions
h) Mark and pack all components in appropriate product covers.
i) Ensure Roof and Walls Fabrics are completely dry before packing
down and fitting the protective covers. Do not put heavy items on
top of the Marquee fabric during transport.
4.2 Maintenance
j) The PVC should be cleaned with mild detergent, do not use any
acidic or alcohol solutions. Only pack the PVC when it is dried
thoroughly, to prevent mold or stains.
k) Do not clean the aluminium parts by acid or high
concentrated cleanser.
l) Store in a cool, dry and clean environment and check
the goods regularly.
4.3 Product Cautions and Safety
m) When the marquee is in use, do not leave your
marquee unattended.
n) Wind rating as per engineering certificate, review
weather conditions.
o) When the Marquee is in use and if part of the structure looks
damaged or not fit for purpose the marquee should be
dismantled at once for safety reasons.