www.extrememarquees.com.au 1300 850 832
10.5
Install one connecting tube to connect the two curve tension bars and
use fastener to tension gable cover.
10.6
Finished gable cover
STEP 11:
Installing the Side Wall Fabric
11.1
Un-zip/separate the wall into two
pieces left/right
IMPORTANT
The sleeve at the
bottom of the wall panel is to be on
the inside of marquee.
NOTE: Inside view of wall