16. Before installing your tank and plumbing, slide the 4 cabane struts into
position as shown and secure with 2 3mm socket head cap bolts per strut.
Again, apply Blue Loctite to all bolts.
17. Mount a 24 ounce Flowmaster gas tank on the tank tray and run your fuel
line (carb feed, fill tube, overflow). Install an EF Fuel Dot for easy fueling/de-
fueling.
22