FALO’ 1XLP
1
2
3
4
5
Step 2
Starting from one side, hook the tile (1) at the bottom in the
proper hooks of the support frame. Repeat the same operation
with the upper tile (2). Following the arrows shown in fi gure,
place the front tile (3). At this point, support it and complete
the opposite side (4 and 5) as described for tiles 1 and 2. The
front side 3 is supported autonomously only after the operation
is completed; therefore, it is suggested to require the help of
another person.
6
8
7
Step 3
Assemble the black painted front profi le using the 2 screws
(SCREW AUT.TCB/C 4.2X9.5 BR) supplied in the box (see
enlargement on top right).
Position the 2 side tiles (6 and 7) tightening them slightly with
the screws pre-assembled on the frame. Position the central
majolica element (8) opening the lateral elements on the
front towards outside. Now, position the lateral tiles again and
tighten all screws moderately.
Step 4
First of all, extract the rod that holds the metallic tile supports.
Proceed by hooking the side tile (A) on the proper metallic
supports. Repeat the operation for both the upper tile (B) and
the 2 tiles on the opposite side (C and D).
A
B
C
D
Tile support
ENGLISH